3
ULTRA-SORB MP INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Field assembly
INSTALLATION
INSERT DISPERSION TUBES INTO AN UNASSEMBLED ULTRA-SORB PANEL
If the Ultra-sorb Model MP panel was shipped unassembled, the dispersion
tubes need to be inserted into the panel.
Note: Use soapy water to lubricate end of tubes where inserted into rubber
grommet.
1. Insert tube into rubber grommet at panel header, with open end at bottom.
Insert at a slight angle to not interfere with top frame of Ultra-sorb panel.
2. Press downward on tube so to clear stud at top of tube. Align tube with
rivet nut on top of the header.
3. Once aligned, turn the tube three full rotations into rivet nut for proper
engagement.
4. Turn the tube backwards so that the steam tubelets face the next tube,
perpendicular to air flow. Face the lowest tubelet of each tube in the same
direction so the facing tubelets are at staggered heights.
5. Tighten the locknut down to the top header to 10 in-lbs (1.13 N-m).
Note: If the rivet nut pulls through, add a ¼"-20 nut on each side of the
top flange to secure the tube.