
Operation Instruction of Grinding Machine
Page 14 of 16
- lift station 1 out of the guide hole
○
24
- position new station 1 (for different nose grind) at the same location. Insert pin
○
25 into guide hole
○
24
- lift clamping plate
○
22 by hand and swing new station 1 to the left until until the clamping face of
the station is completely underneath the clamping plate
○
22
- rotate pin
○
20 90° back again and turn the new station 1 slightly to the left and right until the spring
loaded pin
○
20 snaps into the groove on the bottom side of the station
b. exchange of grind station 2
- pull spring loaded pin
○
20 down and rotate
○
2 90°to lock it in lowered position
- loosen knob
○
19 and swing station 2 to the left until station
○
2 is no longer clamped under the
clamping plate
○
23
- lift station 2 out of the guide hole
○
24
- position new station 2(for different nose grind) at the same location. Insert pin
○
25 into guide hole
○
24
- lift clamping plate
○
23 by hand and turn new station 1 to the right until the clamping face of the
station is completely underneath the clamping plate
○
23
- rotate pin
○
21 90° back again and turn the new station 2 slightly to the left and right until the spring
loaded pin
○
21 snaps into the groove on the bottom side of the station.