Use all of the x6 bolt sets provided
(B, H & F)
.
Use x4 of the x6 bolt sets provided
(B, H & F)
.
6
Bed Assembly
Stage
2a
UPGRADE
SPRUNG
SLAT
SYSTEM
6
6
H
x4
F
x4
B
x4
O
x8
6
Q
P
Q
Stage
2
BED
SLAT
FIXING
H
x6
F
x6
B
x6
5
5
5
Lay the set of slats
(5)
onto the slat
support rails on the side rails.
Align the first and last slat with the
end of the rails, and secure in place
using the bolts
(B)
, washers
(H)
and
sleeve nuts
(F)
. Fully tighten using
the
allen key
(G)
.
Once secure fix the centre slat using
the bolts as before.
Open the metal frame and lay face down on the working
surface.
Fit the support legs
(P & Q)
to the positions shown, securing
with the bolts
(O)
. Fully tighten using the allen key
(G)
.
Carefully turn the slat frame over, and position onto the slat
support rails. Align the frame with the fixing holes at each
end and secure using the bolts (B), washers (H) and sleeve
nuts
(
F
)
. Fully tighten using the allen key
(G)
.
Finally, please ensure that all bol
t
s are fully tightened
before the bed is used.
EITHER
5 OR 6 WILL BE SUPPLIED
- BOXED
SEPARATELY
Page
4
of
6