background image

 

 

 

 

 

 

 

 

 

 

 

           

 

 
                 
 

 

 

 

 

             

 

 

             

 

 

             

     

     

 

             

 

 

             

   

 
 

Revision    number    1/1

 

 

PARTS                                                        Fittings 

 

NO. PART LIST                            QTY   

 

(1)    HEADBOARD                                1 

  (2)    FOOTBOARD                                1 

  (3)    SIDE RAILS ( R&L )                      2 

  (4)    BOTTOM BOARDS                      2

     

 

(5)    GAS LIFT ( R&L )                          2 

  (6)    SIDE RAIL SUPPORT                    2 

  (7)    RAILS ( R&L )                                2 

  (8)    CENTER RAIL                                1 

  (9)    CENTER RAILS                              2 

  (10)    TUBING SLATS                            2 

  (11)    SLATS                                            32   

  (12)    FABRIC PULL HANDLE              1 

 

 

 

A             

C

I             

J             

L             

M             

M8

×

20mmx16pcs 

B             

M6

×

25mmx12pcs 

M8

×

30mmx6pcs 

D

M6

×

40mmx18pcs 

E

M4Allen key 

×

 1pc 

M5Allen key 

×

 1pc 

H

11Spanner 

×

 1pc 

M8 Washer x22pcs 

M6 Washer x36pcs 

M6 NUT x6pcs 

Centre Cap x 16pcs   

Side Cap x32pcs   

Summary of Contents for Cooper Ottoman King Bed

Page 1: ...ngs 4 Assemble this product on a carpet 5 To ensure an easier assembly we strongly advise that all fittings are only finger tightened during initial assembly Only upon completion of the Assembly shoul...

Page 2: ...2 6 SIDE RAIL SUPPORT 2 7 RAILS R L 2 8 CENTER RAIL 1 9 CENTER RAILS 2 10 TUBING SLATS 2 11 SLATS 32 12 FABRIC PULL HANDLE 1 A C I J L K M M8 20mmx16pcs B M6 25mmx12pcs M8 30mmx6pcs D M6 40mmx18pcs E...

Page 3: ...ix the Side rails 3 to Headboard 1 and Footboard 2 by using Spanner F F MAKE CERTAIN THE BED IS SQUARED UP AS SHOWN ON THE RIGHT Once all four corners are located make sure the bed is still square as...

Page 4: ...ASSEMBLY STEP 2 1 Attach Bottom Boards 4 Revision number 1 1...

Page 5: ...und hole first then fit others Revision number 1 1 4 Use bolt C Washer I to fix the Side rail support 6 to Side Rail 3 by using Allen key F 1 loosen the nut then fix the gas lift ROUND HOLE Right Left...

Page 6: ...Use bolt B D with Washer J to fix the Center Rail 8 9 to Tubing Slats 10 by using Allen key E 2 Use bolt D with Washer J to fix the L R Rails 7 to Tubing Slats 10 by using Allen key E 3 make sure hol...

Page 7: ...EP 5 1 Use bolt D Washer J to fix the slat frame to GAS Lifts 5 by using Allen key E and Spanner H Bolts fixing should be in order sequence fit the round hole first then fit others Revision number 1 1...

Page 8: ...ASSEMBLY STEP 6 1 Insert Slats 11 to Side Cap L Centre Cap M afterwards insert the Cap to the holes of 2 x L R Rail 7 Center Rail 9 Revision number 1 1...

Page 9: ...ASSEMBLY STEP 7 1 Attach the Fabric Pull Handle 12 at the end of slat frame see picture beside Revision number 1 1...

Reviews: