background image

© 2002-2006 DreamLine™. All Rights Reserved 

 

Victoria/DLG-65 

4

21.

 

The right stationary glass comes with left side framed in the profile. The metal profile fits over the post. 

Clean the tray surface, apply a layer of silicone and insert the other side of the glass into the side metal 

profile (Step 36).

 

22.

 

Tighten the connection of the metal frame and the guide rails. Snatch the post and the frame of the 

stationary glass together (Step 37).

 

23.

 

Secure the top and bottom guide rails to the side metal profile making sure the screws go into the 

designated threaded slots inside the guide rails. Apply some silicone into the connection between the guide 

rail and the side metal profile (Step 38-40).

 

24.

 

Fix the mirror with the screws and screw cover set (Step 41).

 

25.

 

Secure the glass shampoo shelf on the acrylic back wall (Step 42).

 

26.

 

Fasten the rubber door stoppers in places (Step 43-44).

 

27.

 

Attach the handles.

 

28.

 

Place the roof and fasten it with bolts, apply some silicone on the edges to seal the seams.

 

29.

 

Check the door alignment and smooth operation by adjusting the door rollers (Step 45).

 

30.

 

Seal the connecting joints and seams with silicone as shown ton the pictures (46-52).

 

NOTE: 

 

Allow 24 hours for the silicone to set before testing or using the shower.  

 

NOTE:  Improper application of silicone sealant may cause your shower to leak. 

Notes: Our products are subject to modification without further notice. 

Step 1 

Step 2 

 

Step 3 

 

Step 4 

Step 5 

Step 6 

Summary of Contents for Victoria

Page 1: ...ed and solid and will be able to support the total weight of the unit and its occupant You should also consult your local building codes on questions on installation compliance standards 3 Install all of the required plumbing and drainage before securing the shower Use a competent and licensed if required by local code plumber for all plumbing installation 4 Please insure that prior to the install...

Page 2: ...iding Glass Door 2 Pcs M6X20 bolts Nuts Washer 26 pcs Side Glass Parts 1 Set Left and Right posts 2 pcs Handle 1 Pair Connecting strips 2 pcs Foot Massager 1pc Top and bottom guide rails 2 pcs Handheld Showerhead 1pc ST4 2x16 Tapping Screw 24Pcs Tray pre installation instructions 1 Choose the place where you will locate the tray 2 Unwind the legs to level the tray in case the surface is uneven ...

Page 3: ...be Step 14 16 8 Fasten the acrylic wall using bolts Step 17 9 Next steps are the front glass assembly Using screws fasten the bottom guide rail to the left metal profile left side when you see it from outside of the shower Step 18 10 Insert stationary glass into the guide rail and the metal profile Step 19 11 With the help of a second person insert the second stationary glass in the guide rail and...

Page 4: ...onnection between the guide rail and the side metal profile Step 38 40 24 Fix the mirror with the screws and screw cover set Step 41 25 Secure the glass shampoo shelf on the acrylic back wall Step 42 26 Fasten the rubber door stoppers in places Step 43 44 27 Attach the handles 28 Place the roof and fasten it with bolts apply some silicone on the edges to seal the seams 29 Check the door alignment ...

Page 5: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 5 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 Step 17 Step 18 Step 19 Step 20 Step 21 ...

Page 6: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 6 Step 22 Step 23 Step 24 Step 25 Step 26 Step 27 Step 28 Step 29 Step 30 Step 31 Step 32 Step 33 Step 34 Step 35 Step 36 ...

Page 7: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 7 Step 37 Step 38 Step 39 Step 40 Step 41 Step 42 Step 43 Step 44 Step 45 Step 46 Step 47 Step 48 Step 49 ...

Page 8: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 8 Step 50 Step 51 Step 52 ...

Reviews: