
7
AQUA Series EX and RT panels manual Ver 1 Rev 2 01/2016
wall
U-channel 1
U-channel 2
wall
inside
Fig 3
1
2
3
4
5
6
Fig 2
1
2
3
4
U-channel 1
U-channel 2
outside
inside
wall
5
6
2.
Remove the
U-channel 1 (wall profile) (01)
and
U-channel 2 (bottom profile) (02)
from the
Extender
panel glass (03)
and carefully set the
Extender glass
aside.
Place the
U-Channel 2 (bottom profile) (02)
back onto the
tub surface in-line with the inside U-channel mark.
Mark the drill holes on the tub surface through the
pre-drilled holes in the
U-Channel 2 (bottom profile) (02)
and drill the holes using an
Ø1/8”
drill bit.
Apply waterproof silicone along the bottom surface and
around the holes of the
U- Channel 2 (bottom profile)
(02)
and fasten it to the tub surface with the
Countersunk
screws ST4.2×25 (06)
.
NOTE:
The surface needs to be clean and free of debris
before applying silicone.
See Fig 2 for details
3.
Place the
U-Channel 1 (wall profile) (01
) onto the
U-Channel 2 (bottom profile) (02)
and align vertically with
the inside U-channel wall mark. (Fig 3.1)
Mark the drill holes on the wall through the predrilled holes
in the
U-Channel 1 (wall profile) (01
)
.
Now drill holes in the wall using a
Ø5/16
drill bit and insert
the
Ø5/16” Wall anchors (04).
Apply waterproof silicone along the bottom surface and
around the holes of the
U-Channel 1 (wall profile) (01
)
and fasten it to the wall with the
Countersunk screws
ST4.2×40 (05).
See Fig 3 for details