Dream Line AQUA LUX Installation Manual Download Page 2

Rev.1.2

 

Page

 

2

 

Preparation

   

1.  After opening the boxes, read this introduction carefully, check all the packed parts are 

complete by cross checking all the components against the “Detailed Diagram of Shower 
Door Components”. Examine for shipping damage. If the unit has been damaged or has a 
finishing defect, please contact your local distributor within 3 business days. Please note 
that 

Bath Authority

TM 

/ DreamLine 

TM

 will not replace any damaged product or parts 

free of charge after 3 business days or if the product has been installed. 

Contact your 

distributor or DreamLine if you have any questions. 

 

2.  Please note that you should consult your local building codes on questions on 

installation compliance standards. Building and plumbing codes vary by location, 
and DreamLine is not responsible for code compliance standards for your project. 

 
3.  Please ensure that prior to the installation the floor is leveled and solid. Also make sure the 

walls are at right angles. While some adjustment in leveling of the door is possible, irregular 
floor level or improper angle of side walls will result in serious problems for your installation. 
Please note that there are some adjustments and drilling might be necessary during the 
installation process. 

 
 
 
 

Tools Required 

 

 

 
 
 
 
 
 
 
 

 

 

 

 

Reviews: