28
Section 4 — Maintenance
Air-cooled Generators
4.12 SERVICE SCHEDULE
ATTENTION: It is recommended that all service work
be performed by the nearest Dealer.
SYSTEM/COMPONENT
PROCEDURE
FREQUENCY
X = Action
R = Replace as Necessary
* = Notify Dealer if Repair is
Needed.
Inspect
Change
Clean
W = Weekly
M = Monthly
Y = Yearly
FUEL
Fuel lines and connections*
X
M
LUBRICATION
Oil level
X
M or 24 hours of
continuous operation.
Oil
X
2Y or 200 hours
of operation.**
Oil filter
X
2Y or 200 hours
of operation.**
COOLING
Enclosure louvers
X
X
W
BATTERY
Remove corrosion, ensure
dryness
X
X
M
Clean and tighten battery
terminals
X
X
M
Check charge state
X
R
EVERY 6 M
Electrolyte level
X
R
EVERY 6 M
ENGINE AND MOUNTING
Air cleaner
X
R
2Y or 200 hours
Spark plug(s)
X
R
2Y or 200 hours
GENERAL CONDITION
Vibration, Noise, Leakage,
Temperature*
X
M
COMPLETE TUNE-UP*
TO BE COMPLETED BY A DEALER
2Y or 200 hours
* Contact the nearest dealer for assistance if necessary.
** Change oil and fi lter after fi rst eight (8) hours of operation and then every 200 hours thereafter, or 2 years, which-
ever occurs fi rst. Change sooner when operating under a heavy load or in a dusty or dirty environment or in high
ambient temperatures.
Summary of Contents for 10
Page 34: ...32 32 Section 7 Notes Air cooled Generators ...
Page 35: ...33 Section 8 Installation Diagrams Air cooled Generators Circuit Breakers Drawing No 0G8573 A ...
Page 36: ...34 Section 8 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D ...
Page 37: ...35 Section 8 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D ...
Page 40: ...Part No 0G8334 Revision D 09 16 08 Printed in U S A Catalog No OMASPCA S 01 ...