Arriving at Dock in Marina
Q
Lines secure, including spring lines.
Q
Step stool out, if needed.
Q
Water heater breaker off until Inverter current settles (see “Inverters” below).
Q
Shore power cord connected, AC Power Selector to “Shore”, Shore Power Selector to
power cord location.
Q
Shore power confirmed on meter, Inverter “On”.
Q
Electric use monitored for current capacity of shore facilities.
Arriving at Mooring Buoy
Q
Skipper puts starboard end of swim step, with mate on it, next to buoy.
Q
Mate loops 20' or so line, such as bow line, through buoy ring.
Q
Mate holds two ends together, walks up side of boat to bow of boat.
Q
With buoy held close to bow, line secured to each bow cleat through hawsepipe.
Mooring at Anchor
Q
Anchor is lowered from pulpit while boat is backed up slowly away from anchor.
Q
When desired chain length out (4:1 or 5:1 scope), windlass is stopped.
Q
Engine reversed for “count of five” until chain pulls up virtually straight. Note: The boat
is not held in reverse against a taught anchor chain!
Generator Starting/Stopping (either generator)
Q
Hold “Preheat” switch for 15 seconds, then while holding...
Q
Hold “Start” switch until it starts (if it does not start, repeat “preheat” step)
Q
Check outside exhaust for water flow.
Q
After one minute for warmup, turn Generator Selector from “Off” to “8KW” or “20KW"
and the AC Power Selector to “Gen”
Q
Stopping: Turn power selector from “Gen” to “Off”, wait 1 minute for cool-down.
Q
Hold “Stop” switch until stopped.
Overnight Checklist in Marina
Q
Shore power “On”.
Q
Inverter “On”.
Q
If air cond. or dryer is to be used, you may need generator. Review pg. 4.13.
Overnight at Anchor or Buoy
Q
Anchor light “On”.
Q
DC electrical items all “Off” including radios, extra lights, etc.
Upon Arising
Q
If at anchor or buoy, Inverter only “On” if necessary.
Q
Start a generator if necessary for battery charging or air conditioning or dryer
Q
Inverter “On” if shore power available or generator running.
Q
Turn on heat if necessary.
Q
Go to top of this Dream Catcher checklist.
Section 3A: Operating Checklists 3.2