Rebar Locator DR 30000 PK 

DRC s.r.l. – [email protected] 

Page 1 

 

 

 

 

Table of Contents

 

1 Abstract ............................................................................ 4 

1.1 Introduction .................................................................. 4 

1.2 Fields of application ...................................................... 5 

1.3 Technical Specifications ................................................ 5 

1.5 Care and Maintenance .................................................. 6 

1.6 Liability .......................................................................... 9 

2 Introduction to Product

 .................................................. 10 

2.1 Product Appearance ................................................... 10 

2.2 Button Board Instructions .......................................... 11 

2.3 Accessories Instructions ............................................. 12 

3 Product Instructions

 ....................................................... 12 

3.1 Boot Instructions ......................................................... 12 

3.2 Operating Instructions ................................................ 12 

3.2.1 Start Measuring ....................................................... 13 

3.2.2 Rebar Position 

  Thickness Measuring ............... 18 

3.2.3 Rebar Diameter Measurement(Limited to Different 

Models)...................................................................................... 21 

Summary of Contents for DR 30000 PK

Page 1: ...Care and Maintenance 6 1 6 Liability 9 2 Introduction to Product 10 2 1 Product Appearance 10 2 2 Button Board Instructions 11 2 3 Accessories Instructions 12 3 Product Instructions 12 3 1 Boot Instr...

Page 2: ...stem Setting 25 3 2 7 Power Off 26 Appendix On site Notice 27 Appendix Menu Quick Index 28 Appendix Measurement and Calibration Errore Il segnalibro non definito Appendix Relevant Standards 29 Manufac...

Page 3: ...mbol in this manual represents supplementary specifications 3 In addition to the contents of this manual there are some other prompts displayed automatically when operating please follow the prompts 4...

Page 4: ...ble to carry out non destructive surveys on the concrete thus avoiding to have results falsified by the presence of irons or even to cut them in the case of performing cores All the Non Destructive in...

Page 5: ...ensions measurements of rebars in structural elements Localization of hidden metal objects 1 3 Technical Specifications Items Technical Spec Diameter Measuring Range mm 6 50 Measuring Range mm Locatio...

Page 6: ...king Temperature 10 42 Size mm 170 78 38 Weight kg 0 28 1 4 Care and Maintenance 1 Operation Notice Do not operate the button with too much force and stain it with oil and mud so as not to affect the...

Page 7: ...uses Micro USB standard port It is recommended that the battery should be charged under the shutdown state Please connect the power outlet to AC220 10 V power socket the other end Micro USB port acces...

Page 8: ...cuit the battery and place it near the heat source The battery capacity is 2000mAH 7 4Wh 5 Preserve Clean When the instrument is not used please place it in a ventilated cool and dry relative humidity...

Page 9: ...omatically shut down when the power is too low charge the battery for some time or directly insert it into the charger before switching on Tips we provide a year warranty and life long maintenance ser...

Page 10: ...K DRC s r l info drcitalia it Page 10 2 Introduction to Product 2 1 Product Appearance and buttons a Top View b Bottom View Fig 2 1 General View Tips The actual instrument may differ from the schemati...

Page 11: ...Button Symbol Function Spec Power On Off Confirm Move Right Option Move Up Option Switch Numbers and Letters set second range in the measure inteface Move Down Option Switch Numbers and Letters Retur...

Page 12: ...ig 2 3 USB Cable General View 3 Product Instructions 3 1 Boot Instructions Press the button to power on 3 seconds later the main menu is displayed 3 2 Operating Instructions The main menu includes Sta...

Page 13: ...Measuring The start measuring menu mainly realized these functions such as measurement setting rebar diameter setting component name setting stirrup spacing setting JGJ scanning setting instrument cal...

Page 14: ...ebar Locator DR 30000 PK DRC s r l info drcitalia it Page 14 c Component Name Setting d Stirrup Spacing Setting e JGJ Measurement Setting f Instrument Calibration Fig 3 2 Start Measuring Menu Interfac...

Page 15: ...ecyclable used Enter selected setting and set cursor parameter Return to previous menu Use the rebar diameter setting menu as an example in the following operation When you press to select Rebar Diame...

Page 16: ...measurement result is appeared you should perform zeroing as shown in figure 3 4 In calibrating keep the instrument away from ferromagnetic metal objects just in the air Select the Calibration by pres...

Page 17: ...two letters and three digits which are A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 1 2 3 4 5 6 7 8 9 0 respectively its default setting is HD001 The default setting is HD001 which automaticall...

Page 18: ...and move the instrument rightwards slowly and evenly along the concrete surface until the alignment mark displayed as square shaped frame is changed from hollow square to cross line in solid square in...

Page 19: ...surement a b c As the instrument moves away from the rebar the square shaped frame moves away from the centerline again and gradually moves towards the edge of the screen When the measuring signal com...

Page 20: ...he instrument has not any device to measure distance the thickness interval is only indicative In the measuring interface please operate the following buttons to select the functions Save the measurin...

Page 21: ...er the measuring interface after detecting the position of rebar press Side Upper Button the value of rebar diameter can be displayed as shown in figure 3 5 Fig 3 5 Rebar Diameter Measurement Process...

Page 22: ...to select the functions Switch the up and down cursor position and choose Yes or No recyclable used Switch the left and right cursor position a JGJ Measurement Setting b JGJ Measurement Setting In th...

Page 23: ...italia it Page 23 c JGJ Measuring Interface b JGJ Measuring Data Fig 3 6 JGJ Measurement Setting 3 2 5 Data Management Data management is mainly to view data upload data delete data etc as shown in fi...

Page 24: ...thickness The total number of pages and the current page number The thickness value of each rebar in the current page In the data view interface please operate the following buttons to select the fun...

Page 25: ...3 8 Fig 3 8 Data Delete Tips The instrument contains is about two hundred thousand measuring points of storage Please upload the data to the PC and delete the data timely when the measuring data is cl...

Page 26: ...clable used Confirm to enter the system interface Tips The range of automatic shutdown time includes 5 min 10min 15min 30min 60min 90min 3 2 7 Power Off The instrument has some cases about power off 1...

Page 27: ...top using it and charge it timely If you continue to use it the system will be automatically shut down Appendix On site Notice 1 As the measuring surface is generally rough or concavo convex concrete...

Page 28: ...nment is changed or error measuring results is appeared you should perform the calibration It is recommended to perform the calibration procedure before switching on each time in order to eliminate th...

Page 29: ...eset and perform zeroing Data Review Data View View measuring data Data Delete Delete measuring data System Off Time Set up automatic shutdown time Company Introduction Product ID contact information...