PLUMBING FIXTURE

 

Power water connects to pipes with 3/4" thread in the bottom

 

part of the tank.

 

Blue 

cold water 

inlet; red 

hot water outlet.

 

For potential disconnection of the tank, the sanitary water inlets 

and  outlets  must  be  provided  with  screw  coupling  Js  3/4".

 

The  safety  valve  is  mounted

 

on the cold water inlet identified with a blue ring.

 

Every  hot  sanitary  water  pressure  tank  shall  be  equipped  with  membrane  spring  loaded

 

with  safety  valve.

 

Nominal  clearance  of  safety  valves  is  defined  by  standard.

 

Tanks  are  not 

equipped with a safety valve.

 

Safety valve shall be easily accessible, fitted as close as possible

 

to the tank.

 

The inlet pipes must have at least the same clearance as the safety valve.

 

Safety 

valve is placed high enough to secure dripping water drain by gravity.

 

We recommend mounting 

the safety valve onto a branch pipe.

 

Easier exchange without the necessity of draining water 

from  the  tank.

 

Safety  valves  with  fixed  pressure  settings

 

from  the  manufacturer  are  used

 

for the assembly.

 

The starting pressure of the safety valve must be identical to the maximum 

allowed pressure of the tank, and at least 20 % higher than the maximum pressure in the water 
main (Table 3).

 

If the water main pressure exceeds such value, a reduction valve must be added 

to the system.

 

No closing armature may be mounted between the tank and the safety valve.

 

During the assembly, follow the guide provided by the safety equipment manufacturer.

 

It is necessary to check the safety valve each time before putting it into operation.

 

It is checked 

by manual moving of the membrane from the seat, turning the make

-

and

-

break device button 

always  in  the  direction  of  the  arrow.

 

After  being  turned,  the  button  must  click  back

 

into a notch.

 

Proper function of the

 

make

-

and

-

break device results in water draining through 

the safety valve outlet pipe.

 

In regular operation, such a check needs to be carried out at least 

once a month, and after each shutdown of the tank longer than 5 days.

 

Water may be dripping 

off  the  drain  pipe  of  the  safety  valve;  the  pipe  must  be  open  into  the  air,  pointed  down; 
environment  temperatures  must  not  drop  below  zero.

 

When  draining  the  tank,  use

 

the recommended drain valve.

 

First of all, close water inlet in the tank.

 

Find necessary pressure values in the below Table.

 

Backflow valve must be fitted on the inlet pipe to ensure 

the right operation of safety valve

 

that prevents spontaneous heater draining of the tank and hot water 

penetration  back  into  the  water  main.  We  recommend  that  the  hot  water  distribution  from  the  tank

 

is as short as possible in order to reduce heat losses.

 

At least one demountable joint must be mounted 

between  the  tank  and  every  supply  pipe.

 

Adequate  piping  and  fittings  with  sufficiently  dimensioned 

maximum temperature and pressure values must be used.

 

Tanks must be provided with discharge valve 

mounted  on  the  cold  sanitary  water  inlet  to  the  tank

 

for potential disassembly or repair.

 

When assembling the security equipment, follow the standard.

 

Summary of Contents for OKC 1000 NTR/HP

Page 1: ...water tank OKC 250 NTR HP OKC 300 NTR HP OKC 400 NTR HP OKC 500 NTR HP OKC 750 NTR HP OKC 1000 NTR HP Družstevní závody Dražice strojírna s r o Dražice 69 294 71 Benátky nad Jizerou Phone 420 326 370 990 Fax 420 326 370 980 E mail export dzd cz ...

Page 2: ...ND FITTING INSTRUCTIONS 11 2 1 PUTTING THE TANK INTO OPERATION 11 2 2 CONNECTING A TANK TO HOT WATER SYSTEM 12 2 3 PLUMBING FIXTURE 13 2 4 CONNECTION OF TANK TO HOT WATER DISTRIBUTION SYSTEM 14 2 5 CLEANING OF TANK AND EXCHANGE OF ANODE ROD 15 2 6 SPARE PARTS 16 3 IMPORTANT NOTICES 16 3 1 IMPORTANT NOTICES 16 3 2 INSTALLATION REGULATIONS 16 3 3 DISPOSAL OF PACKAGING MATERIAL AND NON FUNCTIONING PR...

Page 3: ...d by responsible person or unless properly instructed by such responsible person The manufacturer reserves the right for engineering modification of the product The product is designed for permanent contact with drinkable water It is recommended to use the product in indoor environment with air temperatures from 2 C to 45 C and a relative humidity up to 80 Product s reliability and safety is prove...

Page 4: ...ntial inside the receptacle thus reducing effects of corrosion Inside the vessel there is a welded heat exchanger made of steel pipe with enamelled outer coating and connections of hot and cold water circulation and thermostat tank The pipe heat exchanger is only intended for the heating circuit There is a cleaning and revision aperture on the side of the tank ended with a flange of 110 mm clearan...

Page 5: ...MAXIMUM WEIGHT WITHOUT WATER kg 119 133 190 223 259 324 MAXIMUM OPERATING PRESSURE IN THE TANK MPa 1 1 1 1 1 1 MAXIMUM OPERATING OVERPRESSURE IN THE EXCHANGER MPa 1 1 1 1 1 1 MAXIMUM HEATING WATER TEMPERATURE C 110 110 110 110 110 110 MAXIMUM HOT WATER TEMPERATURE C 90 90 90 90 90 90 EXCHANGER HEAT SURFACE m2 2 5 3 2 5 2 6 4 7 0 9 0 EXCHANGER VOLUME L 17 21 32 39 47 63 ENERGY EFFICIENCY CLASS C C ...

Page 6: ... 6 OKC 250 NTR HP Figure 1 OKC 250 NTR HP A 1537 B 660 D 584 E 80 F 1460 G 1060 I 928 J 259 L 209 M 1330 P 355 R 1100 3 4 outer 1 outer 3 4 inner 1 2 inner 6 4 inner ...

Page 7: ... 7 OKC 300 NTR HP Figure 2 OKC 300 NTR HP A 1558 B 750 D 670 E 77 F 1579 G 760 I 895 J 325 L 219 M 1309 P 438 R 1148 1 outer 3 4 inner 1 2 inner 6 4 inner ...

Page 8: ...igure 3 OKC 400 NTR HP OKC 500 NTR HP A 1644 1914 B 812 812 C 852 852 D 700 700 E 55 55 F 1521 1790 G 843 1023 I 1138 1310 J 288 288 L 228 228 M 1081 1253 P 592 592 R 1237 1409 1 outer 3 4 inner 5 4 inner 1 2 inner 6 4 inner ...

Page 9: ...TR HP Figure 4 OKC 750 NTR HP OKC 1000 NTR HP A 2039 2053 B 1017 1117 D 950 1050 D3 225 225 E 105 105 F 1891 1905 G 1123 1173 I 1491 1547 J 383 391 K 727 780 L 294 301 M 1433 1483 5 4 outer 6 4 inner 3 4 inner 5 4 inner ...

Page 10: ... 10 1 2 3 PRESSURE LOSSES Table 2 0 50 100 150 200 250 300 350 400 450 0 0 5 1 1 5 2 2 5 3 3 5 4 4 5 5 mbar m3 h OKC 250 500 NTR HP OKC 250 NTR HP OKC 300 NTR HP OKC 400 NTR HP OKC 500 NTR HP ...

Page 11: ...ay in first the operating and then the safety thermostat b open the hot water valve on the combination faucet c open the cold water inlet valve to the tank d once water starts draining through the hot water valve filling of the tank is completed and the valve must be closed e should a leak of the flange lid occur we recommend tightening the screws of the flange lid f when sanitary water is heated ...

Page 12: ... placed between the safety valve and the heater T fixtures with discharge valve for potential drain of water from the tank have to be mounted on the cold water inlet of the tank The cold water inlet of each individually closable heater must be fitted with a seal test tap or plug to check the non return valve as well as a non return valve and safety valve Heaters with a volume of more than 200 litr...

Page 13: ... provided by the safety equipment manufacturer It is necessary to check the safety valve each time before putting it into operation It is checked by manual moving of the membrane from the seat turning the make and break device button always in the direction of the arrow After being turned the button must click back into a notch Proper function of the make and break device results in water draining...

Page 14: ...flush the heating circuit before the assembly All wiring connections must be properly insulated from heat If the system works with priority heating of HUW using a three way valve always follow the installation instructions of the three way valve s manufacturer Example of group connection of tanks by Tichellman method for equal HSW withdrawal of from all tanks Figure 6 SAFETY VALVE START UP PRESSUR...

Page 15: ...perature of hot sanitary water HSW periodically for a transitional period of time to at least 70 It is also possible to make use of another way of disinfecting HSW PROCEDURE OF EXCHANGING ANODE ROD IN UPPER PART OF THE TANK 1 Turn off control voltage to the tank 2 Drain water from 1 5 tank PROCEDURE Close water inlet in the tank Open the hot water valve on the combination faucet Open the drain tap...

Page 16: ... that the receptacle s flange connection nuts are tightened 3 2 INSTALLATION REGULATIONS Both the electric and water installation must follow and meet the requirements and regulations relevant in the country of use 3 3 DISPOSAL OF PACKAGING MATERIAL AND NON FUNCTIONING PRODUCT A service fee for providing return and recovery of packaging material has been paid for the packaging in which the product...

Reviews: