2
INITIAL INSPECTION AND ASSEMBLY
Carefully unpack the instrument and accessories. Inspect for
damages made in shipment. If any damage is found, notify your
Drawell
representative immediately. All packing materials should
be saved until satisfactory operation is confirmed.
VISIONPLUS EC 331 OVERVIEW
A. Meter Description
1. Battery cover
2. LCD screen
3. Keypad
4. Electrode collar
5. Electrode & ATC assembly
(Electrode cap is not shown.)
B. LCD Display
1
2
3
4
5
6
7
8
9
1. LOW BATTERY indicator
2. CALIBRATION mode indicator
3. MEASURE mode indicator
4. HOLD mode indicator
Hold
Cal
M ode
R
EC
331
VisionPlus
1
2
3
4
5