Draper Nocturne+E Instructions Installation & Operation Download Page 1

Overview -

 Components

CASE

SCREE

N

    M

OUNT

ING

    B

RACK

ETS

   (Wa

ll M

ount s

hown

)

DO

WE

L

END

CAP

SIDE

CABLE

SIDE

CABLE

CABLE MOUNT

(Wall Mount shown)

CABLE

MOUNT

(Deck Mount

shown)

Contents

Overview -

 Components .......................................................................................1

PLEASE READ -

 Safety Information ....................................................................2

Section 1 -

 Prepare for Installation ....................................................................2

Section 2 -

 Mounting Case with Brackets - Wall Installation ........................3

Section 3 -

 Mounting Case with Brackets - Ceiling Installation ....................3

Section 4 -

 Installing Cable Guides ....................................................................4

Section 5 -

 RF Remote Programming Instructions .........................................5

Section 6 -

 Limit Adjustments .............................................................................5

Section 7 -

 Electrical Connections .....................................................................6

Section 8 -

 Wiring Diagrams ................................................................................6

Section 9 -

 Component Dimensions ..................................................................7

Section 10 -

 Assembled Dimensions .................................................................8

POWER DRILL

PENCIL

2

1

TAPE MEASURE

HARDWARE

 (by others) 

LEVEL

PLIERS

CRIMPING TOOL

WIRE STRIPPERS

 CAUTION 

Read and understand 

all warnings before 

beginning installation.

LASER LEVEL

HEX WRENCH

Draper, Inc.  |  411 S. Pearl St. Spiceland, IN 47385 

draperinc.com  |  765.987.7999  |  800.238.7999  

© 2021 All Rights Reserved 

FORM: NocturnePlus_E_Inst21

Nocturne

®

+ E

Outdoor electric projection screen

INSTRUCTIONS

INSTALLATION & OPERATION

If you have any difficulties installing or servicing your  

N E, call your dealer or Draper, Inc. 

TOOLS REQUIRED

PERSONNEL REQUIRED

Summary of Contents for Nocturne+E

Page 1: ...ustments 5 Section 7 Electrical Connections 6 Section 8 Wiring Diagrams 6 Section 9 Component Dimensions 7 Section 10 Assembled Dimensions 8 POWER DRILL PENCIL 2 1 TAPE MEASURE HARDWARE by others LEVE...

Page 2: ...njury 12 Operation of unit should be performed only by authorized and qualified personnel who have been trained in its safe and effective operation and understand its safety features 13 The safety fea...

Page 3: ...s and tighten Set Screws Fig 3 2 Install Cable Guides Section 3 Mounting Case with Brackets Ceiling Installation Optional 1 Attach Mounting Brackets to ceiling using 10 flat head screws installed flus...

Page 4: ...cap flange until taut 4 Mark cable at the bottom of the endcap flange 5 Undo the nut and pull the cable down until the mark aligns with the bottom of the endcap deck mount option shown 7 Crimp the bar...

Page 5: ...t requires 5 32 4mm Allen wrench To Reduce Screen Drop 1 Raise screen surface approximately 1 30cm above desired setting and turn off 2 Turn DOWN I limit screw clockwise 3 screw turns 1 2 roller revol...

Page 6: ...0 120 VAC Line Red to screen directional Brown to screen directional Yellow to 110V 120V AC Hot Black to 110V 120V AC Hot White Common to screen 110V 120V AC Neutral Green Yellow Ground White Common R...

Page 7: ...m 1 29mm 1 25mm Wall Mounting Bracket Cable Guide Wall Mount 3 92mm 3 92mm SCREEN HEIGHT 2 1 44mm 6 4mm 2 70mm 6 152mm 2 64mm 1 25mm 1 25mm 13mm 2 68mm 1 32mm 1 44mm 1 46mm Ceiling Mounting Bracket Op...

Page 8: ...ns Screen Width Overall Case Length Screen Width 2 29mm Dowel Length HEM POCKET Cable Guide Length Wall Mount Deck Mount 13mm from end of case to cable SCREEN HEIGHT 3 92mm 1 27mm from end of case to...

Reviews: