Dragonfly DF-SL-84-MW/HC Installation Instructions Download Page 2

Please follow the assembly and installation instructions 

carefully.  With  proper  assembly  and  installation,  your 

new screen will deliver years of trouble-free service

Preparing your screen for installation

Part List

• Carefully open the package and lay out all the parts on a clean, 

 

  flat surface
• Use extreme caution when unpacking the screen; do not use 

 

  knives or sharp objects to open the packing boxes.
• Do not unpack the screen material at this time.

Aluminum Frame Tube

Tensioning Rod

“L” Bracket 

Assembly  x4

Snap Lug  x34

Washers x8

Top and Bottom Bracket with 

Pre-measured Tether   x1 each

5x40mm Phillips 

 

Head 

Screws X8

Concrete

Anchors  x8

x2

x2

x2

x2

Installing the snap lugs

• Slide the snap lugs into the section of the extruded aluminum 

 

  frame as shown in Diagram 1.

a

Snap Lug

b

•  The  snap  lugs  line  up  with  the  arrow  decals  on  the  frame 

 

  tubes. Alignment is not critical at this stage of the installation. 

 

  Note that the screen is supplied with 2 extra snap lugs; should 

 

  you lose or break a snap lug, one of the spares is a convenient 

 

  replacement.

Installing the screen material

• Place all of the frame tubes face down on the work surface and 

 

  carefully  line  up  the  ends  to  form  shape  of  the  finished 

 

  screen.

• The 4 supplied “L” shaped corner bracket assemblies are used 

 

  to join the individual frame tubes together.

•  Loosen  the  4  screws  on  the  “L”  brackets.  Next,  carefully 

 

  slip the brackets into the aluminum frame channel as shown  

  in diagram 2. 

• It will help to leave the screws loose until you get all of the 

 

  brackets in place.

•  Carefully  line  up  the  frame  corners  and  tighten  the  screws 

 

  slightly; repeat this step at each corner.

•  Note  that  you  may  have  to  loosen  and  adjust  the  brackets 

 

  and frame tubes in order to get the frame perfectly square. A 

 

  carpenters  square  is  very  helpful  with  this  stage  of  the 

 

  assembly. 

• Line up the snap lugs and the screen material with the frame 

 

  and  press  the  snap  lug  through  the  corresponding  hole  in  

  the  material.  Some  adjustment  and  re-adjustment  is  often 

 

  necessary; this is normal. Note that the tensioning rod goes to 

 

  the outside of the snap lug (See Diagram 4). 

•  Repeat  this  process  all  the  way  around  the  frame.  As  you 

 

  position the tensioning rod behind the snap lugs, 

  the  screen  will  become  tighter  on  the  frame  and  any 

 

  wrinkles  or  creases  will  disappear.  It  may  also  be  helpful  or 

 

  necessary to temporarily “unsnap” or loosen the snap lug for 

 

  adjustment, especially as you work to the final corners of the 

 

  screen.

• Once  the  screen  is  in  place  and  the  tensioning  rods  are 

 

  seated  behind  all  of  the  snap  lugs,  inspect  the  front 

 

  of  the  screen.  Make  sure  that  the  screen  material  is  flat 

 

  and  wrinkle-free.  Also,  check  the  corners  to  make  sure  that 

 

  the  screen  is  properly  positioned.  If  there  are  any  wrinkles 

 

  or  positioning  issues,  simply  lay  the  screen  face  down  and 

 

  adjust accordingly.

• Note that some very small fold lines or wrinkles may exist for a  

  few hours; this is due to the packing of the screen and they  

  will disappear within a short time.

• Make sure that hands and work area are clean before working 

 

  with the screen materials

•  Carefully  unpack  the  screen  material-  Use  caution  as  the  4 

 

  tensioning rods are contained inside the cardboard tube. 

• Carefully lay out the screen material so that it roughly lines 

 

  up with the frame- Exact position  is not critical at this stage of 

 

  the assembly. It is important that the screen material is facing 

 

  the correct direction. It is easy to identify the back side of the 

 

  screen as it will have the stitched or welded seam visible. 

• Unpack the 4 metal tensioning rods.

• Insert the long metal tensioning rods into the longer edges 

 

  of  the  screen  material,  one  rod  per  side.  It  is  easier  if  the 

 

  screen  is  flat  on  the  floor.  Use  care  when  installing  the  rod;  

  do not force it or damage to the screen material may occur 

 

  (See Diagram 3). 

•  Insert  the  shorter  tensioning  rods  into  the  corresponding 

 

  sides  of  the  screen;  as  with  the  longer  rods,  use  caution  to 

 

  avoid damage to the screen (See Diagram 3). 

Assembling the frame

b

d

c

a

top frame

strip nuts

side frame

L B

racket

Diagram 1

Diagram 2

Diagram 3

Tension Rod

a

c

b

Diagram 4

a

b

c

d

e

Top Frame Bar

Side 

Frame 

Bar

Top Bracket 

screen

Front View

Back View

Side View

Top View

Bottom  Bracket 

screen

screen

screen

Reviews: