23 / 96
4.8.2 Inlet conditions, version F
LT
PI
PT
Fig. 5:
F = Pressure booster system with break tank arranged on same level as pump,
suction head operation
A
1
3
1
2
A
Fig. 6:
Scope of supply, version F
1
Suction line (included in DP’s scope of supply)
2
Lift check valve (included in DP’s scope of supply)
3
Dry running protection (not included in DP’s scope of supply)