A5
INSTALLATION
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and accessories.
1. To the electrician
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
WARNING
The electrician must make sure that the supply cable does not come in contact
with the oven top which becomes hot.
2. To the plumber
This equipment is to be installed to comply with the applicable federal, state or local plumbing codes.
Connect the steam system (1/4 NPT) to the cold water distribution network.
We highly recommend to use a water softener to eliminate minerals in the water. We suggest you to
use CUNO # CFS6135 (Doyon part number PLF240).
WARNING
Do not adjust the needle valves, it has been done at the factory.
Summary of Contents for JA8
Page 21: ...SECTION B DIMENSIONS ...
Page 24: ...B3 50 7 8 75 1 4 51 13 16 JAOP8 JAOP8 ...
Page 25: ...B4 51 13 16 75 1 4 50 7 8 JA8SC JA8SC ...
Page 28: ...B7 51 13 16 75 1 4 50 7 8 JA8 JA8 ...
Page 30: ...SECTION E COMPONENT PARTS ...
Page 31: ...E1 TIMER 4 3 2 1 RST OMRON H5CL OMRON E5CS F ON AL 1 2 3 4 5 6 7 11 13 14 15 16 JAOP8 JAOP8 ...
Page 33: ...E3 1 2 3 4 5 JAOP8 JAOP8 ...
Page 35: ...E5 1 2 3 4 5 6 7 8 JAOP8 JAOP8 ...
Page 37: ...SECTION F CONTROL PANELS ...
Page 46: ...SECTION G ELECTRIC SCHEMATICS ...