A5
INSTALLATION
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and accessories.
1. To the electrician
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
WARNING
The electrician must make sure that the supply cable does not come in contact
with the oven top which becomes hot.
2. To the plumber
This equipment is to be installed to comply with the applicable federal, state or local plumbing codes.
Connect the steam system (1/4 NPT) to the cold water distribution network.
We highly recommend to use a water softener to eliminate minerals in the water. We suggest you to
use CUNO # CFS6135 (Doyon part number PLF240).
WARNING
Do not adjust the needle valves, it has been done at the factory.
Summary of Contents for JA12SL
Page 21: ...SECTION B DIMENSIONS ...
Page 23: ...B2 37 1 2 JAOP6SL JAOP6SL ...
Page 26: ...B5 37 1 2 JA6SLSC JA6SLSC ...
Page 29: ...B8 37 1 2 JA6SL JA6SL ...
Page 32: ...B11 37 1 2 JA12SL JA12SL ...
Page 35: ...B14 37 1 2 JAP12SL JAOP12SL ...
Page 37: ...SECTION E COMPONENT PARTS ...
Page 38: ...E1 BAKING TIMER THERMOSTAT 1 2 4 6 7 8 12 14 15 16 17 18 19 JAOP6SL JAOP6SL ...
Page 40: ...E3 6 5 4 3 2 1 11 10 9 12 7 8 13 JAOP6SL JAOP6SL ...
Page 42: ...E5 4 5 1 2 3 6 JAOP6SL JAOP6SL ...
Page 44: ...E7 7 WATLOW 5 AMPS 1 2 3 4 5 6 8 JA6SLSC JA6SLSC ...
Page 46: ...E9 2 1 3 4 7 6 5 JA6SLSC JA6SLSC ...
Page 48: ...E11 4 5 2 3 1 JA6SLSC JA6SLSC ...
Page 50: ...SECTION F CONTROL PANELS ...
Page 57: ...SECTION G ELECTRIC SCHEMATICS ...