![Doyon JA10 Important Safety Instructions Manual Download Page 10](http://html1.mh-extra.com/html/doyon/ja10/ja10_important-safety-instructions-manual_2525328010.webp)
A8
OPERATION OF THE PROOFER
1.
Switch "ON".
2.
Set the thermostat control at 100
o
F.
3.
Set the humidity control at approximately : 3 for JAOP-3 & JAOP-6
4 or 5 for JAOP-10
5 for JAOP-14
4.
If there is too much fog and water drips from the glass doors, adjust humidity control to a lower
number.
5.
When the temperature is stabilised, put the products in the proofer.
(Leave them inside until they are ready to bake.)
6.
IMPORTANT :
When proofing cycle is completed, turn the humidity switch to "OFF" and
let the motor blower and air heat element run for 10-15 minutes to let dry the proofer. Then, turn
the main switch off, and leave the door ajar to prevent moulding.
When the proofer is not in operation, open the doors to let out the humidity and to prevent
mould.
P.S.
The doors should not be opened unnecessarily to conserve the heat and humidity in the
proofer.
Every day cleaning of the water pan under the proofer's doors should be exercised.
All manuals and user guides at all-guides.com
Summary of Contents for JA10
Page 21: ...SECTION B DIMENSIONS All manuals and user guides at all guides com a l l g u i d e s c o m...
Page 24: ...B3 35 50 1 2 38 JA10 JA10 SLIDING DOORS All manuals and user guides at all guides com...
Page 28: ...B7 73 1 4 50 1 2 JAOP10 JAOP10 SLIDING DOORS All manuals and user guides at all guides com...
Page 32: ...B11 73 1 4 51 1 2 JA20 JA20 SLIDING DOORS All manuals and user guides at all guides com...
Page 34: ...SECTION E COMPONENT PARTS All manuals and user guides at all guides com...
Page 46: ...SECTION F CONTROL PANELS All manuals and user guides at all guides com a l l g u i d e s c o m...
Page 63: ...SECTION G ELECTRIC SCHEMATICS All manuals and user guides at all guides com...