
Maintenance
• Inspect Latch annually or more frequently if the gate is used often.
• Only lubricate with powdered graphite lubricant. No petroleum-based lubricants, oils etc.
• Keep Latch free of contaminants
Mark the Latch position on Fence Post.
Drill 2mm Ø pilot holes, and secure with
supplied countersunk screws.
Position Button Body with Spindle in the
slot on Latch Body. Mark mount holes, drill
2mm Ø pilot holes then secure.
Close gate and place Striker Rod in Latch
and mark the Rod’s centre on gate. Drill
pilot holes and mount.
Test lock and unlock from both sides.
Button
Body
13mm
7mm
CENTERLINE OF LATCH
3/4"
SPINDLE THRU HOLE
GATE FRAME
3/4"
FIG. 1
Spindle
12mm
Screw
30mm
Screw
Cut 11-13mm Longer than Gate Post
Spindle Tube MUST be fitted
Spindle Tube to be 11 to 13mm longer than Gate Post
Spindle
INSIDE LATCH
OUTSIDE LATCH
POST
(mm)
TRIM MARK
50
6
75
4
90
3
100
2
125
no trim
TIP: Use a hacksaw to avoid
bending the Spindle.
Trim both Spindles using the trim
marks.
2
3
4
5
6