3

Risks of fire

Do no

t expose battery to direct sunlight.

Avoid contact with conductive objects such as wires. 

Keep battery away from fire source, inflammable, explosive and chemical materials.

Do not dispose of batteries in a fire. The batteries may explode.

Risks of electric shock

Do not touch battery with wet hands.

Keep battery away from children and animals. 

A battery can present a risk of electric shock and burns by high short-circuited current.

Battery installation and wire connection must be operated by professionals.

Risks of damage

Keep a dis

t

ance to water source.

Do not subject battery to high voltage.

Place battery on a flat surface. Do not place any foreign object on top of battery nor step on battery.

Battery-connected PCS should have reinforced insulation.

Table 1-1

Responses to Emergencies

Event

Description and recommended actions

Leakage

Inhalation: leave the contaminated area right now.

Swallow: induce vomiting.

Contact with eyes: flush eyes with flowing water for 15 minutes.

Contact with skin: wash thoroughly with soap and water.

Immediately seek for medical intervention after taking emergency measures.

Fire

Battery may catch fire when heated above

 150

Please implement the following actions:

Extinguish fire before the battery catches fire. ABC or carbon dioxide extinguisher is

recommended.

If the fire is too strong to put out, move battery to a safe place before it catches fire.

If battery is on fire, evacuate people first before seeking help from professional fire

protection personnel. 

If battery catches fire during charging, turn off the breaker between battery and PCS

when safety can be guaranteed.

Wet battery If battery became wet or has been submerged in water, do not access it. Immediately contact 

your distributor for technical assistance.

Damage

Damaged battery is dangerous and must be handled with utmost care. They are not usable 

for use and could pose a safety threat to people or property. If battery is suspected to be 

damaged, stop any operation and return it to distributor.

4

2 Overview

iPack C3.3 is a 3.3 kWh standalone LiFePO4 battery pack. It has a 48V battery module as the main power

supply unit composed of 64 Ah cells in one parallel and 16 serial connect (1P16S)

Battery coordinates with

PV, power conversion system (PCS), Grid, DC Breaker and loads in the residential energy storage system. 

2.1 Application Scenarios

The typical application scenarios are as shown below.

The energy produced by PV is optimized to 

supply loads. The excess energy is used to 

charge battery, then export to grid.

Battery powers loads at nighttime when there 

is no PV. If battery energy is insufficient, it can 

supply loads together with grid

.

Junction Box

Junction Box

When grid falls, battery and PV can power 

loads.

Battery can be charged by grid. Users are 

suggested to store energy from grid to battery 

when electricity price is relatively lower.

2.2 Product Features

Compared with normal batteries, the battery is characterized with better charging and discharging

performance, longer cycle life and less self-discharging loss. The build-in BMS can monitor battery operation 

status and alarm timely to avoid operation out of limit. A maximum of 6 batteries can be parallel-connected

to expand energy and power of energy storage system. Battery realizes communication with PCS via CAN

network port.

Monitoring: 

9

4 Tools and Protective Equipment

Before installing, operating, and maintaining the battery, you need to prepare tools and protection equipment to 
ensure safety.

Wire stripper

Wire cutter

Wire crimper

Hydraulic plier

FUSED

FUSED

1000V MAX

10A

100mA

COM

V

¡

OFF

V

A

A

V

ɏ

Hz

%

Screwdriver

Hex key

Multi-meter

Insulated gloves

Safety goggle

Safety shoes

To prevent injury, always wear acid-resistant clothing, PVC gloves, goggles and rubber boots during

installation, operation, and maintenance.

10

5 Installation

It is recommended to install the battery into a cabinet and place it indoor. If you install it outdoor, select a 

cabinet with a sufficient IP rating. Build sunshade & rain shelter to avoid direct exposure to sunlight and rain for 

outdoor application.

5.1 Inspection before Installation

Before installation, check carefully for any damages on the package and the products and inspect if all 

accessories in the list are included. 

If any part 

is missing or damaged, please contact your distributor.

Item NO.  Part Name

Quantity

Item NO. 

Part Name

Quantity

1

Standalone Battery

1pcs

5

User Manual

1pcs

2

Bracket

2pcs

6

Quick Guidance

1pcs

3

Screw 

4pcs

7

Warranty Card

1pcs

4

Crystal plug

2pcs

8

Accessory List

1pcs

5.2 Battery Orientation

The battery can be installed in any direction except upside down and at most 6 pcs of batteries can be 

connected in parallel (up to 6p).

×

×

Summary of Contents for iPack C3.3

Page 1: ...iPack C3 3 Lithium Iron Phosphate Battery Residential Energy Storage System User Manual Date 2021 03 18...

Page 2: ...tallation 14 3 Battery Storage and Transportation 8 3 1 Safe Storage 8 3 2 Safe Transportation 8 4 Tools and Protective Equipment 9 5 Installation 10 5 1 Inspection before Installation 10 5 2 Battery...

Page 3: ...s functions and safety precautions as provided in this document Target Audience Installer operator commissioning personnel maintenance personnel of the RESS product Symbols and Conventions Warning and...

Page 4: ...n aucune fa on 2 Do not use the battery for purposes not described in its documentation N utilisez pas la batterie des fins non d crites dans sa documentation 3 Do not drop strike puncture or step on...

Page 5: ...e or property If battery is suspected to be damaged stop any operation and return it to distributor 3 Risks of fire Do not expose battery to direct sunlight Avoid contact with conductive objects such...

Page 6: ...nighttime when there is no PV If battery energy is insufficient it can supply loads together with grid When grid falls battery and PV can power loads Battery can be charged by grid Users are suggeste...

Page 7: ...PCS via CAN network ports Parallel connection Support a maximum of 6 batteries in parallel connection Power off triggered by fault Forced power off When battery does not connect to mains supply hold...

Page 8: ...y 58 6Ah 3 0kWh 4 Operating Voltage 44 8 57 6V 5 Max Charging Current 7 7 7 7 7 7 LED1 LED5 LED2 LED3 LED4 6 Table 2 2 Ports and terminals No Label Name 1 Link Out Output network port for parallel con...

Page 9: ...C 45 C within 6 months Temperature 30 C 20 C 45 C 60 C within 7 days for shipping state Humidity 5 95 RH Within 6 month after each charge 14 RTE 94 0 2C charge discharge 25 C 15 DOD 93 16 EOL 10 years...

Page 10: ...A 5 C 45 C 4 5HFKDUJH XQWLO LFNV 3 2 Safe Transportation Battery has cleared UN38 3 Section 38 3 of the Seventh Revised Edition of the Recommendations on the Transport of Dangerous Goods Manual of Tes...

Page 11: ...nt to ensure safety Wire stripper Wire cutter Wire crimper Hydraulic plier FUSED FUSED 1000V MAX 10A 100mA COM V OFF V A A V Hz Screwdriver Hex key Multi meter Insulated gloves Safety goggle Safety sh...

Page 12: ...any damages on the package and the products and inspect if all accessories in the list are included If any part is missing or damaged please contact your distributor Item NO Part Name Quantity Item N...

Page 13: ...rk Cable A Network Cable B No 10 No 11 No 12 Negative Cable No 13 Positive Cable List Crystal Head Iteam 1 iPack C3 3 2 iPack C3 3 3 iPack C3 3 4 iPack C3 3 5 iPack C3 3 6 iPack C3 3 No 1 1 2 3 4 5 6...

Page 14: ...d 1 2 batteries 2 column holes 2 4 batteries 3 column holes 5 6 batteries 4 column holes 3 This quick guidance is based on 6 batteries 4 Positioning the hole on the wall punch hole with impact drill t...

Page 15: ...and lock it with M5 16 bolts torque is 4NM Fixing bracket connecting plate Place connecting plate on the bracket and lock it with M5 16 bolts torque is 4NM Fix the outside battery Place the outside ba...

Page 16: ...e junction box the horizontal hole spacing is 126mm the vertical hole spacing is 146mm the depth is 50 55mm and place the plastic expansion tube 6 30 in the hole Use M4 30 screws to fix the Junction b...

Page 17: ...erter cable to the left right hole of the MCB respectively Fix the upper cover of the Junction box to the bottom with self tapping nails Inverter Inverter Inverter Inverter Inverter Inverter Two Batte...

Page 18: ...twork ports Pin No PCS Link In Link Out 1 RS485_B CAN2_H CAN2_H 2 RS485_A CAN2_L CAN2_L 3 NA Ecode_IN Ecode_OUT 4 CAN0_H ISO_GND ISO_GND 5 CAN0_L Master IN Slave IN 6 NA Dry1 Dry1 7 PCS_WAKE Dry1 Dry1...

Page 19: ...copper wires into the joint sleeve 3 Press connecting part with a hydraulic clamp 4 Tighten up sealing sealing nut and joint sleeve Step 2 Make Network Cable A 1 Strip cable sheaths for 15 0 5 mm fir...

Page 20: ...de Wear protection equipment when wiring batteries Ensure all cables are smooth and not twisted Keep the battery in off mode and connect it in the following way Step 1 Connect network cable 1 Plug one...

Page 21: ...nd capacity connect batteries in parallel At most 6 pcs of batteries can be connected in parallel WARNING Batteries in parallel should not have a cycle difference more than 300 Step 1 Before installin...

Page 22: ...o the Link Out port of the first battery and the other end into Link In port of the second battery The process goes on until the last battery is connected 4 Insert a terminator a crystal plug with pin...

Page 23: ...0V If any abnormality is detected immediately power off the battery Proceed again only after causes are confirmed 7 1 Power on Battery The battery can be powered on by either charging voltage or the P...

Page 24: ...afety gloves 2 Turn on the breaker and hold the POWER button for three seconds to power off battery 3 Unplug power cables and network cables from battery terminals 4 Loosen the screws the battery from...

Page 25: ...t II from the Device Type dropdown list and Extend from the Frame Type dropdown list and set Baud Rate to 500K Keep other default parameters Click OK 3 Choose target upgrade file and click Start Upgra...

Page 26: ...Slave 1 Slave 2 Slave 3 Slave 4 Slave 5 Slave 6 Application Mode checking Parallel or single application mode checking success SOC Display Blink 5 times 2S Fault Cell Over Voltage LED5 depending on t...

Page 27: ...sing the battery you should read the specifications safety information and operation instructions carefully to learn its application method and scenarios If the product or accessories are damaged by i...

Page 28: ...e LED On Blue LED flash display nical Parameters ms Specifications minal Voltage V 51 2V al Capacity Energy 64Ah 3 3kWh able Rated Capacity Energy 58 6Ah 3 0kWh erating Voltage 44 8 57 6V x Charging C...

Reviews: