![Dover Triton FT5000 Site Preparation And Installation Manual Download Page 12](http://html1.mh-extra.com/html/dover/triton-ft5000/triton-ft5000_site-preparation-and-installation-manual_2524806012.webp)
FT5000 - S
ITE
P
REPARATION
AND
I
NSTALLATION
G
UIDE
305.7
Maneuvering Clearance.
Where a clear floor or ground space is located
in an alcove or otherwise confined on all or part of three sides, additional
maneuvering clearance shall be provided in accordance with 305.7.1 and
305.7.2.
305.7.1 Forward Approach.
Alcoves shall be 36 inches (915 mm)wide mini
mum where the depth exceeds 24 inches (610 mm).
Figure 305.7.1 Maneuvering Clearance in an Alcove, Forward Approach
305.7.2 Parallel Approach.
Alcoves shall be 60 inches (1525 mm) wide mini-
mum where the depth exceeds 15 inches (380 mm).
Figure 305.7.2 Maneuvering Clearance in an Alcove, Parallel Approach
308 Reach Ranges
308.1
General.
Reach ranges shall comply with 308.
308.2
Forward Reach.
308.2.1 Unobstructed.
Where a forward reach is unobstructed, the high forward
reach shall be 48 inches (1220 mm) maximum and the low forward reach
shall be 15 inches (380 mm) minimum above the finish floor or ground.
1 2
Summary of Contents for Triton FT5000
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK 8 FT5000 SITE PREPARATION AND INSTALLATION GUIDE ...
Page 9: ...9 ATM INSTALLATION FOR ACCESSIBILITY ...
Page 21: ...21 ATM ENVIRONMENTAL PRECAUTIONS CHECKLIST ...
Page 23: ...23 SITE PREPARATION INSTALLATION Ground exterior ...
Page 44: ...44 FT5000 SITE PREPARATION AND INSTALLATION GUIDE THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 45: ...45 POWER AND COMMUNICATION ...
Page 48: ...48 THIS PAGE INTENTIONALLY LEFT BLANK FT5000 SITE PREPARATION AND INSTALLATION GUIDE ...
Page 49: ...49 NMD 100 DISPENSING MECHANISM REMOVAL INSTALLATION ...
Page 54: ...54 THIS PAGE INTENTIONALLY LEFT BLANK FT5000 SITE PREPARATION AND INSTALLATION GUIDE ...
Page 55: ...55 REAR SERVICE PANEL RSP TCP IP and VSAT INSTALLATION CONNECTIVITY ...