![Dover PSG ALL-FLO IOM A050 Series Installation Operation & Maintenance Data Download Page 12](http://html1.mh-extra.com/html/dover/psg-all-flo-iom-a050-series/psg-all-flo-iom-a050-series_installation-operation-and-maintenance-data_2525007012.webp)
ALF-11030-E-02
All-Flo
12
REPAIR AND ASSEMBLY
PUMP WET END REMOVAL
STEP 1
Using the 1/2 inch wrenches
remove four “Hex-Head Cap
Screws” and four “Hex Flange
Nuts” from the “Discharge
Manifold”.
STEP 2
Remove the “Discharge Manifold”.
STEP 3
Remove the “O-Ring”, “Valve Seat”
and “Ball” from the “Discharge
Manifold”.
TOOLS NEEDED
1) One Wrench,
7
/
16
Inch
2) Two Wrenches, ½ Inch
3) Two Wrenches,
7
/
8
Inch
WARNING
Prior to servicing the pump, ensure that the air
and fluid lines are closed and disconnected. While wearing personal
protective equipment, flush, drain and process liquid from the
pump in a safe manner.
WARNING
Maintenance must not be performed when a hazardous atmo-
sphere is present.
STEP 4
Using the 1/2 inch wrenches
remove four “Hex-Head Cap
Screws” and four “Hex Flange
Nuts” from the “Suction
Manifold”.
STEP 5
Remove the “Suction Manifold”.
STEP 6
Remove the “O-Ring”, “Valve
Seat” and “Ball” from the
“Outer Chambers”.
7
SECTION