Combo Single Level / Hydrocarbon Liquid Sump
Sensor
Part #30-3224
This sensor is made from the Hydrocarbon Liquid Sump Sensor (30-
3219-12) with an Interstitial Level Sensor (30-3221-1A) clipped to its
side. The combination sensor is designed to detect the presence of
liquid hydrocarbons and water in sumps, dispenser pans and other
locations where the presence of a liquid could indicate that a leak has
occurred.
The sensor contains a carbon/polymer material that changes
resistance when exposed to liquid hydrocarbons. The level sensor
portion simply clips onto the hydrocarbon sensor and can be
positioned at any desired height to activate in the presence of liquid.
This sensor can be used to monitor wet wells to ensure that a liquid is
normally present. In the event of a break in the cable, the system will
activate the alarm.
Combo Single Level / Hydrocarbon Liquid Sump Sensor
*Maximum Wiring Length is the maximum length of cable to be used
to connect all sensors on an individual channel. The length includes
run of cable from VSmart to each sensor board in the string.
Combo Single Level/Hydrocarbon Liquid Sump Sensor
Substances Detected:
Liquid Hydrocarbon and Water
Operating Temperature:
-4°F to 122°F (-20°C to +50°C)
Dimensions:
30-3221-1A
30-3219-12
1.3” x 3.9” (3.4 cm x 10 cm)
1.7” x 13.2” (4.4 cm x 33.5 cm)
Required Cable:
12’ (3.6 m) gas-and-oil resistant cable
Maximum Wiring Length*:
1,000’ (305 m)
Nominal Resistance
(uncontaminated):
1K - 5K ohms
Nominal Resistance
(contaminated):
30K - 200K ohms
Multi-Drop Restriction:
1 per channel
Connections:
Channel 1: Red = Power, Black = Signal
Channel 2: White = Signal
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...