
28
External-Style Pressure Relief Valve A-1402C Series
8.3.5
Permanently attach a metal tag to the valve body with repair/test date, repair facility identification and technician I.D.
8.3.5
Store the valve in a clean, dry place until ready to use.
9 MAINTENANCE
9.1
PRIOR TO MAINTENANCE TASKS PERFORMED
9.1.1
Retesting of Valves in Storage
Midland valves are factory set and sealed. If they have been left in their original shipping containers, are undamaged, and are
no more than six (6) months old; they may be installed without being retested.
10 WARRANTY
Midland warrants the products of its own manufacture to be free of defects in material and workmanship for a period of one (1) year
from the date of invoice. Furnished materials and accessories purchased from other manufacturers are warranted only by and to the
extent of those manufacturers’ warranties, if any.
MIDLAND MAKES NO WARRANTY OF ANY KIND WHATSOEVER, EXPRESS OR IMPLIED, OTHER THAN AS SPECIFICALLY STATED HERE
MIDLAND MAKES NO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR USE.
Midland’s obligation under this warranty is strictly limited, at its option, to 1) repair or replacement at its factory of a like quantity of
product: 2) refunding to purchaser money paid to Midland for its product: or 3) issuance of written authorization for the Purchaser to
repair or replace, at costs comparable to Midland’s normal manufacturing costs those parts proven defective, provided that Purchaser
has given to Midland immediate notice upon discovery of such defect Merchandise claimed to be defective shall not be returned
without first obtaining Midland’s written consent. The undertaking of repair or replacement by the Purchaser, or its agents, without
Midland’s written consent, shall void Midland’s warranty and relieve Midland of all responsibility. Under no circumstances shall
Midland be liable for any direct, incidental, consequential or other damages of any kind in connection with the installation, operation,
maintenance, repair, inspection or other use of any product purchased from it.
NOTE:
It is essential to establish a periodic retesting and preventive maintenance program for pressure relief
valves. The DOT and AAR have set forth a retesting interval that should be considered the maximum length of
time between tests. If your company’s experience indicates that a shorter interval is advisable, a program with
more frequent retesting should be implemented.
NOTE
NOTE:
It is an AAR requirement (refer to D4.04) that new O-rings be installed when a valve is retested.
NOTE