background image

 

 

 

 

P/N: DFV-SWIFT-DM, Version C 

Page 8 of 10 

 

Multi-Compartment Delivery (COMP) 

1. 

Select “BULK”, “DISL” or “PTRL” on the DFV-Swift (refer to Figure 1.1, page 2). 

2. 

Look at sightglass to see if the manifold has product in it and select “DRY” or “FULL.” 

3. 

Hold down the “Manifold valve” button and press down the desired compartment button on the Swift- Mx 

Box for three (3) seconds. 

4. 

Turn on the pump.  

5. 

Product is dispensed via bulk outlet (Bulk) or nozzle (Diesel or Petrol). 

6. 

Monitor delivered quantity (refer to Figure 1.2, Page 2 for delivery diagnostics). 

7. 

Complete the compartment delivery by selecting one of the following options. There are two options for 

ending a compartment delivery, “PIPE” OR “STOP.” 

a.  PIPE = End delivery and purge manifold pipework. This is used when the next delivery is a 

different product type. Purging the pipework will deliver all remaining product in the pipework via 

the bulk or nozzle used. 

b.  STOP = End delivery and leave product in the manifold pipework. This is used when the next 

delivery is the same product type.  

HINT:

 Before product changeover occurs, e.g., switching from Diesel to Petrol, the manifold should be 

empty (dry). The best time to empty the manifold is at the end of a delivery. 

Use the “PURGE BULK HOSE” button at the end of the bulk delivery to assist with emptying the 

hose.  

8. 

Close the nozzle/outlet and stop the pump. 

9. 

Select “NEXT” when the product has stopped flowing. 

10. 

Look at sightglass to see if the manifold has product in it and select “DRY” or “FULL” 

11. 

Select “COMP” when the delivered volume and levels are displayed. 

12. 

Select “COMP” again to deliver the same product from another compartment. 

13. 

Hold down the “Manifold valve” button and press down the desired compartment button on the Swift- Mx 

Box for three (3) seconds. 

14. 

Turn on the pump. 

15. 

Product is dispensed via bulk outlet (Bulk) or nozzle (Diesel or Petrol). 

16. 

Monitor delivered quantity (refer to Figure 1.2, Page 2 for delivery diagnostics). 

17. 

Complete the delivery by selecting one of the following options. There are two options for ending a 

delivery, “PIPE” OR “STOP.” 

18. 

Select “NEXT” when the product has stopped flowing. 

19. 

Look at sightglass to see if the manifold has product in it and select “DRY” or “FULL.” 

20. 

Close the nozzle/outlet and stop the pump. 

HINT: I

f you wish to delivery a 3rd or more comparmtent repeat Steps 10 - 20 in Section 3.4.

 

 

21. 

Select “PRNT” to complete the multi-compartment delivery and print docket.

 

 

TIP:

  Key Considerations: 

  The delivery will stop once the 200L 

remaining

 level is reached and you will be prompted to verify 

that you are able to deliver the remaining amount.  

o

  Confirm if the compartment has been emptied upon completion of delivery. 

  If changing over product, use the “PIPE” option to purge the manifold pipework. 

 

 

SAFETY ADVICE: DO NOT press “PURGE” with the cap on the bulk outlet, this will pressurise the 

cap. 

 

Summary of Contents for Liquip Swift

Page 1: ...Document P N DFV SWIFT DM Version C Issue Date September 23 2019 Swift Delivery System Driver s Manual ...

Page 2: ...reen Delivery Screen Compartment Level Screen Figure 1 1 Home Screen Figure 1 2 Delivery Screen Delivery Screen Callouts 1 Delivery Type GRAV BULK DISL PTRL 2 Amount of Product Delivered 3 Status of Delivery 4 Remaining Amount of Product in Compartment 5 First Compartment Delivered From 6 Flow Rate of Delivery 7 Function Instructions and Buttons Figure 1 3 Compartment Level Screen Press MENU twice...

Page 3: ...ed and press STOP if required to stop the flow of product This will also close the foot valve NOTICE The flow will also stop after ALL product in compartment has be delivered 9 Physically close the API and confirm the close on the DFV Swift screen This will reopen the foot valves and flood the pipework if any product remains 10 Select PRNT to complete delivery and print docket Single Compartment G...

Page 4: ...rop Partial or Full TIP Ensure there is appropriate space for delivered product in tank prior to and during delivery 1 Connect delivery hoses to ALL APIs and connect the product delivery elbows to be delivered from 2 Select GRAV on the DFV Swift Home screen refer to Figure 1 1 page 2 3 Wait for the DFV request and then open foot valves by pushing down of the FOOT VALVES button on the Swift Mx Box ...

Page 5: ...and purge manifold pipework This is used when the next delivery is a different product type Purging the pipework will deliver all remaining product in the pipework via the bulk or nozzle used b STOP End delivery and leave product in the manifold pipework This is used when the next delivery is the same product type HINT Before product changeover occurs e g switching from Diesel to Petrol the manifo...

Page 6: ...very diagnostics 11 Complete the delivery by selecting one of the following options There are two options for ending a delivery PIPE OR STOP a PIPE End delivery and purge manifold pipework This is used when the next delivery is a different product type Purging the pipework will deliver all remaining product in the pipework via the bulk or nozzle used b STOP End delivery and leave product in the ma...

Page 7: ... two options for ending a delivery PIPE OR STOP a PIPE End delivery and purge manifold pipework This is used when the next delivery is a different product type Purging the pipework will deliver all remaining product in the pipework via the bulk or nozzle used b STOP End delivery and leave product in the manifold pipework This is used when the next delivery is the same product type c Batch Quantity...

Page 8: ...le outlet and stop the pump 9 Select NEXT when the product has stopped flowing 10 Look at sightglass to see if the manifold has product in it and select DRY or FULL 11 Select COMP when the delivered volume and levels are displayed 12 Select COMP again to deliver the same product from another compartment 13 Hold down the Manifold valve button and press down the desired compartment button on the Swi...

Page 9: ...mper hoses are connected as per delivery procedures To enable delivery via Trailer B 1 Pull out TRANSFER VALVE button on the trailer B Swift Mx Box To enable deliver via Trailer A 1 Press down both the MANIFOLD VALVE and TRANSFER VALVE button for three 3 seconds on the Trailer B Swift Mx Box 2 To complete a Gravity Bulk or Hose Reel Diesel or Petrol delivery follow the procedures in Sections 2 and...

Page 10: ...Page 10 of 10 ...

Reviews: