Dover Ebsray R75 Installation, Operation & Maintenance Instructions Manual Download Page 6

 

 

Table 1: Torque required for bolted connections 

SECTION 5 - MAINTENANCE 

 

Failure to set the vehicle emergency 
brake and chock wheels before 
performing service can cause severe 
personal injury or property damage. 

 

 

Failure to relieve system pressure prior 
to performing pump service can cause 
serious personal injury or property 
damage.

  

Systems with meters will still 

be pressurized even after the hose is 
emptied

 

 

 

 

Hazardous 

machinery can 

cause serious 

personal injury.

 

 

Hazardous pressure 

can cause serious 

personal injury or 

property damage 

 

 

Failure to disconnect and lockout 
electrical power or engine drive before 
attempting maintenance can cause 
severe personal injury or death 

 

 

Disconnecting fluid or pressure 
containment components during pump 
operation can cause serious personal 
injury or property damage. 

 

 

 

Hazardous 

machinery can 

cause serious 

personal injury.

 

 

Hazardous pressure 

can cause personal 

injury or property 

damage 

 

 

 

 

 

5.1 

ROUTINE MAINTENANCE & INSPECTION 

NOTE: 

Maintenance shall be performed by qualified technicians 

only, following the appropriate procedures and warnings 

as presented in this manual.

 

Routine maintenance and inspections can be performed with the 
pump ‘in-situ’, so long as complete isolation, depressurising and 
purging  procedures  have  been  completed.  However  for 
repair/overhaul,  it  is  recommended  that  the  pump  be  removed 
from the installation.

 

The R75 ball bearings are sealed for life.  As such there are NO 
routine maintenance requirements. 

Ebsray recommends a maximum interval of three months or 500 
hours  operation  between  routine  inspections  (More  frequent 
inspections  may  be  necessary  dependent  upon  usage,  site 
conditions,  and  operation).    These  inspections  should  include 
(but not limited to) checking for; 

 Leakage  from  the  pump, 

pipework, valves etc. 

  Excess vibration/noise 

 Excessive heat from the R75 or hydraulic system. 

5.2 

MAINTENANCE 

– REPAIR & OVERHAUL 

If the pump is being sent to Ebsray for maintenance or repair the 
pump  must  be  fully  flushed  out.  i.e.  returned  in  the  state  it  was 
provided. 
 
Numbers in parentheses (i.e. Cover (2)) following individual parts 
indicate reference numbers specified in SECTION 6. 
 
Steps before disassembly 

1. 

Obtain the appropriate Work Permit if required. 

2. 

Isolate power supply to motor 

– if fitted. 

3. 

Isolate  pump  from  liquids  in  inlet  and  discharge  lines, 
depressurise and purge out any toxic, flammable, corrosive 
or air hardening liquids (if present). 

Once the pump is removed from the pipework, flange O-rings and 
gaskets cannot be re-used. 

 

Short video tutorials are available on the Ebsray pumps website 
covering main maintenance tasks. 
 
 

 
Tools required for maintenance: 

  Metric Allen key set 

  Metric socket drive  

     Allen key set 

  Torque wrench 

  Small flat head screwdriver 

 

  Short  (100mm  long) 

piece  of  1-1/4  inch 
schedule 40 pipe  

  Soft head mallet 

  External circlip pliers 

 

Before any re-assembly ensure all parts are deburred and cleaned. 
All O-rings MUST be replaced when any disassembly occurs. 

 

5.3 

SPARE PARTS 

When  ordering  spare  parts,  to  minimise  pump  downtime, 
ALWAYS  quote  the  pump  Serial  Number  located  on  the 
nameplate of the pump or SECTION 2.3 of this publication. 

NOTE: 

Substitute or so-

called ‘equivalent’ spare parts are not to 

be used. Safe operation and pump performance may be 

severely compromised if any substitute parts are used. 

The use of substitute parts may void the warranty. 

5.4 

INSPECTION UPON DISASSEMBLY 

1. 

Check Impeller  (3)  and  seal  zone  of  the  Bearing  Housing 
(20) for damage or wear.  Replace Impeller if blades have 
been  damaged  or  wear  exceeds  minimum  recommended 
dimensions: 

 

Minimum Impeller width is 21.70mm  

 

Minimum outside diameter is 155.75mm. 

 

2. 

Check  Shaft  for  wear,  damage  or  run-out.  Replace  as 
required.

 

3. 

Inspect  both  Bearings  for  wear.  It  is  recommended  during 
major overhauls that Bearings be replaced. Ball bearings are 
to be replaced after 50,000 operational hours.

 

 

4. 

Check Mechanical Seal components for wear or damage. It 
is  recommended  during  major  overhauls  that  Mechanical 
Seal components be replaced. 

Metric  
setscrew size 

Reference 
number/s 

Torque required  
in Nm (ft-lbs) 

M12 

6, 27 

100 (75) 

M10 

100B, 103B 

58 (43) 

M6 

99B 

13 (10) 

M5 

57A 

7 (5) 

Summary of Contents for Ebsray R75

Page 1: ...rsonal injury death or major property damage Warns of hazards that CAN cause serious personal injury death or major property damage Warns of hazards that CAN cause personal injury or property damage NOTE Indicates special instructions which are very important and must be followed 1 3 ESSENTIAL HEALTH SAFETY REQUIREMENTS This publication is intended to assist those involved with the installation op...

Page 2: ...ION 2 3 If replacement parts are needed or if information pertaining to the pump is required this data must be furnished to an Ebsray representative The R75 pump is listed by Underwriters Laboratories for liquefied petroleum gas service 2 2 TECHNICAL DATA Maximum Operating Temperature 135 C 275 F Maximum Pump Speed 3450 RPM Maximum Differential Pressure 1400 kPa 14 Bar Maximum Working Pressure 292...

Page 3: ...ransit should be noted on the packing note and on both your own and the carrier s copy of the consignment note Should a shortage be evident on receipt notify Ebsray immediately giving full details and packing note number Additionally a claim should be made with the transport company When received on site the pump set must be stored in a dry covered area NOTE Never allow water or any corrosive prod...

Page 4: ...TO driven Hydraulic motors should be well supported with their shafts parallel to the pump shaft in all respects Ebsray provides an optional close coupled hydraulic motor adapter The adapter provides for straight alignment of a hydraulic motor drive through a coupling connected to a straight key pump shaft 3 9 PUMP INTERNAL RELIEF VALVE NOTE The pump internal relief valve is designed to protect th...

Page 5: ... such conditions as excessive heating of ball bearings vibration or unusual noises NOTE Consult SECTION 7 of this manual if difficulties during start up are experienced and troubleshooting is required 4 3 PERIODIC INSPECTION Periodic inspection of the Pump Pump System and Ancillary Equipment is required to maintain safety conformity operational functionality and reliability If any abnormal conditi...

Page 6: ...ust be fully flushed out i e returned in the state it was provided Numbers in parentheses i e Cover 2 following individual parts indicate reference numbers specified in SECTION 6 Steps before disassembly 1 Obtain the appropriate Work Permit if required 2 Isolate power supply to motor if fitted 3 Isolate pump from liquids in inlet and discharge lines depressurise and purge out any toxic flammable c...

Page 7: ...tridge 10 Fit the smallest new O ring 48 to the Seal Seat and lightly lubricate 11 Without removing the protective cover press the Seal Seat into the Cartridge with fingers ensuring complete and square engagement 12 Remove the protective cover from the Seal Seat clean with non residue contact cleaner 13 Fit the new O rings 57B 57C to the Cartridge and lightly lubricate The smaller cross section O ...

Page 8: ...ubricated new O ring 3 Remove the Bypass Spring Then remove the Valve 105 If the Valve is stuck use pliers or similar to pull the Valve out NOTE Be careful not to scratch the Valve with the pliers as any foreign materials left inside the pump WILL seriously damage the pump 4 Fit the new Valve and or Bypass Spring then the Valve Cover 5 Ensuring the valve cover O ring is located properly hand fit t...

Page 9: ...ousing 1 101 Adaptor Flange Elbow 1 27 Cap Head Setscrew 8 101A Adaptor Flange Elbow Plug 1 33 Dust Seal Bearing 1 102 Blanking Flange 1 34 Key Driver 1 103 Valve Cover 1 40 Seal Seat 1 103A O ring Valve cover 1 41 Seal Face 1 103B Cap Head Setscrews 4 42 Seal Sleeve 1 104 Bypass spring 1 45 Seal Spring 6 105 Valve 1 46 O ring Shaft 1 106 Spring Cap 1 47 O ring Seal Sleeve 1 106A O ring Spring Cap...

Page 10: ......

Page 11: ... Foreign matter in discharge line Collapsed or kinked discharge hose Pressure Viscosity Temperature or Speed not as per design conditions Foreign matter jamming parts Pump out of alignment with driver Parts worn End of service life or adverse pumping conditions Excessive Noise Foreign matter jamming parts Parts worn End of service life or adverse pumping conditions Incorrect driver speed Faulty or...

Page 12: ...12 NOTES Visit www ebsraypumps com au for more information on any Ebsray products 156 South Creek Rd Cromer 2099 Australia Telephone 612 9905 0234 Fax 612 9938 3825 Email sy sales psgdover com ...

Reviews: