Step 5: Assemble the support pipes
For this step, please prepare six upper support pipes (No.6),
six lower support pipes(No.7), twelve M4*10mm bolts(No.9),
and the screwdriver(No.10).
Insert an below support pipe to each upper support pipe.
Screw six M4*10mm bolts to fix. Insert above support pipe
assemblies to the frame. Screw six M4*10mm bolts to fix.
Attention:
The upper support pipe has a top cap, while the
upper support pipe doesn’t have.
7
9
9
6
Step 6: Assemble the net
There are six sleeves on the net(No,8), and six bands under the net.
Attach the net to the trampoline.
Insert six support pipes to six sleeves.
Tie bands under the net to the spring triangle rings.
Attention:
If the band is very difficult to touch the triangle ring, please try pulling the bottom of
the net down a little.
Page 5
1
2
3