Page 7
Step 3: Assemble the main pipe
To assemble the main pipe, please prepare eight M8 curved
washers(No.65), four M8*65mm Allen bolts(No.78), four
M8 lock nuts(No.84), four M8 split washers(No.86), socket
wrench(No.94), and M6 Allen wrench(No.95).
Insert the main pipe into the frame.
Insert a M8 Allen bolt and a M8 curved washer into every
hole of the joint. And than screw a M8 curved washer, a
M8 split washer and a M8 lock nut in turn with M6 Allen
wrench and socket wrench.
Attention:
Please be careful not to pinch the cable.
Don’t tighten all bolts until you finish all assembly steps.
When tightening the bolts between the main pipe and frame,
please ensure that
3 to 4
threads are visible outside the nut to
avoid any wobbling.
A
2
84
78
78
65
65
84
86 65
1
B
2
78
78
65
86 65
84
84
avoid pinching
the cable.
Step 4: Assemble the bottle holder
Screw two M4 self tapping screws(No.19) to assemble
the bottle holder(No.41) on the main pipe with the socket
wrench(No.94).
41
19
2
4 threads are visible
outside the nut.