Dosatron unit sold separately.
ASSEMBLY INSTRUCTIONS
IPK34 - 14 GPM
Industrial Plumbing Kit
2090 Sunnydale Blvd.
Clearwater, FL 33765
727-443-5404
800-523-8499
For units: D14MZ2, D14MZ5, D14MZ10, D14MZ3000
2015-02 LA 2011-140-GEN23_14 GPM
For quick priming (helpful at low water flows):
Shut off outlet ball valve
Insert injection hose into the chemical container
Turn on the stainless steel ball valve (collect discharged
solution or send it to drain)
Observe the injection hose. When full, count 10 clicks
Shut off stainless steel ball valve
Turn outlet ball valve on
For sample collection:
Make sure the unit is primed
Shut off outlet ball valve
Turn stainless steel ball valve on
In a clean container, collect 2.5 gallons of diluted solution
Shut off stainless steel ball valve
Collect sample out of the 2.5 gallons and check
concentration
Turn on the outlet valve