
Fig. 8: Connecting Ground
Personnel:
Electrician
+ additional qualification explosion protection
Protective equipment:
Protective workwear
Protective gloves
Anti-Static Safety Boots
1. Assemble ground conductor on the ground con-
nection (1).
2. Measure grounding resistance.
5.4
Connecting
Connecting material supply
Fig. 9: Material supply connection
Personnel:
Mechanic
Protective equipment:
Eye protection
Protective gloves
Anti-Static Safety Boots
1. Connect the pressure side material supply
system (1).
2. Connect the suction side material supply
system (2).
Connect compressed air supply
WARNING!
Excessive control air pressure
Excessive control air pressure can damage the
pump. Serious injuries and death can be the con-
sequence.
– Do not exceed the control air pressure
Assembly
01/2020
EcoPump AD - MPU00013EN
11/36