9.3.8 Replace paint pipe (for flammable
paints)
Personnel:
Operator
+ additional qualification high tension
technology
+ additional qualification explosion pro-
tection
Protective equipment:
Protective workwear
Anti-Static Safety Boots
Requirements:
Disassembly
Fig. 42: Disassemble cover
1. Loosen cover (1) with open-end wrench
SW22.
Fig. 43: Loosen nuts
2. Loosen the nuts (2, 4) with the supplied
open-end wrench (included in the tool
kit).
3. Remove paint pipe (3).
Faults
11/2019
EcoGun AS MAN DC - MSG00023EN
34/56