![Dorner iDrive 3200 Series Installation, Maintenance & Parts Manual Download Page 7](http://html1.mh-extra.com/html/dorner/idrive-3200-series/idrive-3200-series_installation-maintenance-and-parts-manual_2523202007.webp)
851-702 Rev. A
7
Dorner Mfg. Corp.
3200 Series iDrive Belt Conveyors
Installation
Figure 7
Figure 7
3. Roll out conveyor belt and place conveyor frame
sections
into belt loop.
Figure 8
Figure 8
4. Join conveyor sections and install connector brackets
9, item 2)
and screws
on both sides
as indicated. Tighten screws to 60 in-lb (7 Nm).
Figure 9
Figure 9
Figure 10
Figure 10
5. Tighten conveyor belt, refer to “Conveyor Belt
Tensioning” on page 14.
6. Install mounting brackets and return rollers. Refer to
“Mounting Brackets” on page 7 and “Return Roller” on
page 8.
Mounting Brackets
1. Locate brackets. Exploded views shown in Figure 11 &
Figure 11
Figure 11
Figure 12
Figure 12
NOTE
For Conveyors longer than 20 ft (6096 mm)
use the process outlined in the “Conveyor
Belt Tensioning” section on page 14. Extend
the Drive End Tail Assembly to the zero mark
of the tension indicator
before proceeding to step 5. The zero mark
for the tension indicator is when the indicator
begins to turn black.
1
1
1
3
1
2
1
1
5
4
3
2
1
5
4
3
2