dormakaba RTS88 Package 04 Installation Instructions
08280291
02-2020
RTS88 Closers
7
Adjustments - door alignment
Adjustments - clearances
2
Adjustments
Lateral
adjustment
screw
Closer
Cover plate
1/4-20 flat
head screw
2.1 Door alignment
Fig.5
2.1.1
Double acting -
•
Center door in frame by loosening 1/4-20 flat
head screw and adjusting the two 1/4-20 hex
head alignment screws as required.
•
To adjust clearance between door and frame,
adjust lateral adjustment screw.
•
Retighten 1/4-20 flat head screw.
•
TIGHTEN SECURELY!
1/4-20 hex
head alignment
screws
2.1.2
Single acting -
•
Adjust top rail arm to insure that door closes
tightly against stop.
•
Loosen 1/4-20 flat head screw.
•
Adjust closer arm fully in the direction of door
swing.
•
To adjust clearance between door and frame,
adjust lateral adjustment screw.
•
Retighten 1/4-20 flat head screw.
•
TIGHTEN SECURELY!
2.2 Clearance requirements
Fig.6
2.2.1
The standard spindle for 7471K will achieve a
door clearance of 11/16” measured from
finished floor to bottom of door.
2.2.2
See chart on template for optional spindles
and door clearances.