background image

makes also sense from an economic point of view. 
This allows you to detect and eliminate possible 
damage or wear early on. The risk of unforeseeable 
costs due to, for example, high repair costs can be 
minimized – and we will help you keeping an eye on 
your budget. The goal is always to increase the service 
life of your door systems. 
dormakaba will assume the complete organization 
and execution of the maintenance. Your benefits: all 
installations will be tested by trained experts in 
regular intervals - even systems from other 
manufacturers. The building operator does not have 
to take care of anything; legal requirements will be 
met in a reliable manner.
A maintenance contract for the door will ensure the 
tested reliability according to a premium standard.
We want to convince you as well – let us prepare you 
a non-binding and free quote for a maintenance 
contract. 
For more information on this topic and many others 
on the  
dormakaba service, please go to our homepage at  
www.dormakaba.com.

10 Dismounting, 

recycling and 

disposal

Dismantling is the same procedure in reverse and 
must be carried out by qualified personnel. 

DANGER

Danger to life through electric current

Works on electrical systems must only be 
carried out by skilled electricians.
•  Before starting work on electrical systems 

and equipment, establish a zero-potential 
condition and ensure this condition while 
carrying out the work.

The product must be disposed of environmentally 
sound. Electro-technical parts and batteries must not 
be disposed of as household waste. Dispose of 
electro-technical parts and batteries in the arranged 
acceptance and collection points.

6.1  Acceptance test

After installation an acceptance test is to be carried 
out according to the test book for catching devices. 
The acceptance test must only be carried out by 
skilled staff that is certified for this by dormakaba. 
Follow the details from the data sheet about the use 
of catching devices. The acceptance test must be 
documented in the test book for catching devices.

7  Operating

7.1  Open and lock door

1. 

Open door leaves to the fixture point. 

 

‣ The door leaves remain standing after letting 

go.

7.2  Close door

1. 

Press shut the door leaf or press the optional 
manual release button.

 

‣ The door leaf is released and closes.

8  Maintenance

The performance of the maintenance must only be 
carried out by skilled personnel that is authorized by 
dormakaba.

Follow the details from the data sheet about the use 
of catching devices. 

TIPS AND RECOMMENDATIONS

Dust deposits in the smoke detector may 
lead to false alarms. 
•  Where appropriate, shorten the required 

maintenance intervals when using in 
rooms with heavy exposure to dust.

The smoke switch board must be exchanged every 8 
years according to DIN 14677 Achievement of the 
replacement time is continuously shown by the 
illuminating diode LED 2.

9  Maintenance by 

dormkaba

A regular maintenance of your system will pay off: 
weak spots are detected and eliminated early, the 
service life will be increased.
dormakaba and its authorized partners offers a 
premium maintenance service for automatic doors 
and catching devices, whereby the offcial seal of 
approval provides the operators of the building with 
reliable safety. If not all door systems are properly 
tested, the building operator will be liable for property 
damage and physical injuries in case of an accident. 
Irrespective of safety aspects, a regular maintenance 

7

G-EMR XEA

2018-11

dormakaba Installation manual

WN 059420 45532

Closing the installation

Summary of Contents for G-EMR XEA

Page 1: ...3 3 Product description 4 3 1 RMZ 4 3 1 1 DIP switch on the RMZ 4 3 1 2 Clamp terminal assignment of the RMZ 4 3 1 3 Display of the operating status of the RMZ 4 3 2 EMF 4 3 3 Technical data 4 3 3 1 RMZ 4 3 3 2 EMF 4 4 Installation 5 4 1 Prepare the mounting of the slide rail 5 4 2 Mount the base 5 4 3 Mount the slide rail and RMZ 5 4 4 Mount the door closer 5 4 5 Establish electrical connections ...

Page 2: ...rovided documents Installation manual Connection diagrams RMZ RM ED Data sheet about the use of arrest systems General building approval 1 4 Symbols and abbreviations used 1 4 1 Safety instructions DANGER This signal word indicates a situation of immediate risk which will lead to death or serious injury if not averted CAUTION This signal word indicates a situation of potential risk which could lea...

Page 3: ... circuit breaker simultaneously serves as disconnect device to switch the RMZ to zero potential The transverse section of the mains supply line must only be a max 3 x 1 5 mm NYM 2 Safety DANGER Danger to life through electric current Works on electrical systems must only be carried out by skilled electricians Before starting work on electrical systems and equipment establish a zero potential condi...

Page 4: ...l manual release with terminating resistor 43 kOhm 10 7 NO Potential free changer low voltage SELV 24 V AC DC 1 A 8 NC 9 C 11 Potential free clamp 16 Bus 3 1 3 Display of the operating status of the RMZ Functions of the LEDs LED on LED off Operating display LED 1 green red operation green Alarm smoke detector red Alarm manual release button red Service display LED 2 yellow Maintenance due flashing...

Page 5: ...base 7 Screw the slide rail onto the base 8 Insert the connection cables of the EMF into the RMZ 4 4 Mount the door closer 1 Mount the door closer and lever to the door closer according to the enclosed instructions for the door leaf 2 Adjust the door closer 4 5 Establish electrical connections 1 Connect the 230 V AC connection cable For maintaining the protection category II protective insulation ...

Page 6: ...can be released manually or by cutting of the power supply 5 6 1 Release EMF manually 1 Open the door leaf and lock it 2 Pull on the door leaf The door leaf is released and closes 5 6 2 Delete EMF electronically 1 Open the door leaf and lock it 2 Cut off the power supply i e operation of the manual release button The door leaf is released and closes 5 7 Check the function of the catching device vi...

Page 7: ...est After installation an acceptance test is to be carried out according to the test book for catching devices The acceptance test must only be carried out by skilled staff that is certified for this by dormakaba Follow the details from the data sheet about the use of catching devices The acceptance test must be documented in the test book for catching devices 7 Operating 7 1 Open and lock door 1 ...

Page 8: ...dormakaba Deutschland GmbH DORMA Platz 1 58256 Ennepetal Germany T 49 2333 793 0 F 49 2333 793 4950 www dormakaba com 013558 Translation of the original manual subject to change without notice ...

Reviews: