STEP 7
Attach a top slat (K) onto top side rails (H & I) of the top bunk with flat head wood screws (4).
Make sure the slat touches the corner posts (as close to the headboard as possible). Attach the other
slats (K) onto the top side rails (H & I) with flat head wood screws (4) and place the slats (Z) onto
the top side rails (H & I) as shown.
NOTE: Slats (K & Z) must be atatched so that they curve up in the middle and down on the ends.
Attach the assembled short guardrail to top post (A) with wood joint connectors (3), and to top side
rail (H) using hex socket head bolts (8) and hex caps (7) as shown. And use Allen key (12) to
tighten the hex cap (7).
TWIN/FULL BUNK BED
2
slats: 8 for the upper bunk
DA6940E (ESPRESSO) / DA6940W (WHITE)/ DA6940BL(BLUE)
Summary of Contents for DA6940BL
Page 4: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE...
Page 5: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE...
Page 6: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE...
Page 7: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE...