NOTE:
One of the end of full headboard top rail (G) has metal dowel hole on it. Be sure to
attach the bottom post (E) in this end for first headboard and attach the bottom post (D) in this
end for second headboard.
NOTE:
It may require to make full headboard top cross (X) and full headboard bottom cross
(Z) further apart or closer in order to align wood dowels (7) with holes in bottom posts (D and
E).
TWIN/FULL BUNK BED
DA1008TFBB-1, DA1008TFBB-2
STEP 2
Insert wood dowels (7) into the ends of full headboard top cross (X) and full headboard
bottom cross (Z). Insert full headboard panel (Y) into the grooves of the full headboard top
cross (X), then push the full headboard bottom cross (Z) up to firmly secure it in place. Attach
bottom posts (D) & (E) with wood joint connectors (3) using hex key (8).
3