background image

15

INST

ALLA

TION

Fig. 14. Connect air transfer tubes

Fig. 14.1

Fig. 14.2

B

Summary of Contents for DSHINF Series

Page 1: ...1 DoorHan 08 2020 Operation and Installation Instructions Inflatable dock shelter of DSHINF series General Information 2 Design 2 Safety Rules 3 Installation 4 Operation 20 Appendix 21...

Page 2: ...ght 3 Front storage curtain 4 Left right frame 5 Counterweight 6 Blower 7 Dock shelter roof 2 DESIGN Table 1 Specifications Parameter Value Air bags control system Three phase power supply 380 415 V 5...

Page 3: ...ety instructions can operate power tools It is recommended to use power tools operating at volt age not exceeding 380 220 V Choose power tool taking into consideration electric shock hazard of the pre...

Page 4: ...el trained at DoorHan training center and having a corresponding certificate Use of appropriate mounting tools is strictly required The manufacturer does not di rectly control installation operation a...

Page 5: ...4 Fig 5 Fig 6 Fig 7 Fig 10 Fig 8 Fig 11 Fig 9 Fig 12 4 3 PACKAGE INVENTORY INSTALLATION 2 pcs 2 pcs 2 pcs Fig 14 Fig 15 Fig 13 Fig 18 Fig 17 Fig 16 Fig 19 B C E D F L 250 mm 110 mm 6 3 25 mm 6 3 38 m...

Page 6: ...6 INSTALLATION Fig 1 2 Fig 1 3 Fig 1 Prepare side frames View 1 100 mm 500 mm Fig 1 1 View 1 125 mm 7 mm 50 mm 4 4 INSTALLATION...

Page 7: ...7 INSTALLATION Fig 2 View 2 Fig 2 1 View 2 105 mm Fig 2 2...

Page 8: ...8 Fig 3 Fasten side frames to building wall Fig 3 1 View 1 Fig 3 2 View 2 200 mm View 1 View 2 INSTALLATION...

Page 9: ...9 INSTALLATION Fig 4 3 View 2 Fig 4 1 View 1 Fig 4 Fig 4 4 Fig 4 2 100 mm 300 mm View 1 View 2...

Page 10: ...10 INSTALLATION Fig 5 Fig 5 2 Fig 5 3 Fig 5 1...

Page 11: ...11 INSTALLATION Fig 6 Install top air bag Fig 6 1 Fig 6 2...

Page 12: ...12 Fig 7 Install guide rod Fig 7 1 Fig 7 2 Fig 7 3 INSTALLATION...

Page 13: ...13 INSTALLATION Fig 8 Fig 9 Fig 10 400 mm 155 mm 90 820 mm...

Page 14: ...Install counterweight Fig 13 1 View 1 Fig 13 2 View 2 View 2 View 1 B INSTALLATION Fig 12 Fig 11 F Before attaching the counterweight cable to the shaft turn the shaft until the top air bag rises all...

Page 15: ...15 INSTALLATION Fig 14 Connect air transfer tubes Fig 14 1 Fig 14 2 B...

Page 16: ...16 INSTALLATION Fig 15 Fig 15 1 Fig 15 2 Fig 15 4 Fig 15 3 Fig 15 5 E D D D...

Page 17: ...17 Fig 16 Fig 16 1 Fig 16 2 INSTALLATION B B...

Page 18: ...18 Fig 17 Fig 17 1 Fig 17 2 INSTALLATION B B...

Page 19: ...19 Fig 18 Fig 20 Fig 19 Fig 21 INSTALLATION 4 2 u 32 mm C...

Page 20: ...ck is stationary the handbrake is put on the wheels are choked 4 Inflate dock shelter switch the blower on by pressing a push button on the control unit if the blower motor is operated with the dock l...

Page 21: ...100 30 100 10 10 1 0 10 Dock shelter wall Dock leveler Bumper Dock shelter wall Dock leveler Bumper A A A A Bar C Clamping plate Bumper PVC buffer Dock shelter wall Rubber bumper PVC buffer Rubber bu...

Page 22: ...22 Fig 2 Inflatable dock shelter exploded view APPENDIX 1 2 6 9 8 10 16 19 18 3 5 4 7 15 17 20 13 20 11 12 21 14 22...

Page 23: ...10 DKHA20040 3410 Clamping profile L 3410 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Sel...

Page 24: ...KHA20040 3610 Top clamping profile L 3610 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Self...

Page 25: ...KHA20040 3610 Top clamping profile L 3610 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Self...

Page 26: ...ly 4870 u 800 mm 1 DSI07 32 Left side air bag 4600 u 800 mm left 1 2 DSI03 11 Left shelter wall assembly 4870 u 800 mm 1 Table 2 to Fig 3 Right side frame Part number Description Qty DSI04 2 Right fra...

Page 27: ...15 Right end support bracket 70u 5 without plate 1 6 14019 Self tapping screw ISO 15480 ST6 3 u 25 4 Table 2 to Fig 4 Top frame with 1600 mm top air bag option Part number Description Qty DSI01 4 Uppe...

Page 28: ...l formed channel 60 32 4 mm shelter side wall with a fastening angle self tapping screw PVC dowel shelter side wall with a fastening angle concrete brick Installation clearance 600 700 mm for a shelte...

Page 29: ...U V W PE M 2 4 6 PE L2 L3 L1 N 3 5 1 13 Fig 6 Blower motor wiring diagram If the blower motor is connected to the dock leveler control unit than see a corresponding wiring diagram in the control unit...

Page 30: ...30 NOTES...

Page 31: ...NOTES 31...

Page 32: ...n on purchasing distribution and servicing contact DoorHan central office at 120 Novaya street bld 1 Akulovo village Odintsovo district Moscow region 143002 Russia Phone 7 495 933 24 00 E mail info do...

Reviews: