58
742.641 | 11.43
EN
Setting the country
Note
The country can only be set once!
1. Press
to select a country.
2. Press
SET
briefly. The country is adopted.
3. Press
SET
for a longer time.
Finishing initial commissioning
1. Read the displayed text and use
to page down until
the text shown at the left is displayed.
2. Press
ESC
and
to correct settings
or
Press and hold SET for a longer period of time to finish
initial commissioning. The inverter then synchronises
with the mains grid.
8.8
Switching on the DC supply
Set the DC circuit breaker on the inverter to position
I
After testing via the internal MSD (approx. 2 minutes), the feed-in power can be shown on the
display (assuming that sunlight is present).
Fig. 7:
Set the DC circuit breaker on the inverter to position
I
Summary of Contents for High Efficiency 3.0
Page 111: ...109 742 641 11 43 Zertifikate Certificates Certificats ...
Page 112: ...110 742 641 11 43 ...
Page 113: ...111 742 641 11 43 ...
Page 114: ...112 742 641 11 43 ...
Page 115: ...113 742 641 11 43 ...
Page 116: ......