5
3.5
Combustion products exhaustion
The installation of exhaustion of the products of combustion has to be carried out by qualified
personnel staff and it will fulfill the requirements demanded in the legislation and effective
regulatory schemes.
The
Evolution
boilers are balanced flue oil boilers, so that the combustion products exhaustion is
carried out by means of an outlet duct and an air intake from outside. It is recommended that the
position at the exhaustion duct exterior portion should be in accordance with the data of the
following figures and table:
Position of the exhaustion duct
Minimum distance
mm
A
under a cornice
300
B
between two horizontally-arranged ducts
1000
C
from a next window
400
D
between two vertically-arranged ducts
1500
E
from a next venting grid
600
F
under a balcony (*)
300
G
under a window
600
H
under a venting grid
600
I
from a break back of a building
300
J
from an angle of a building
300
K
from the floor level
2500
L
from a vertically/horizontally-arranged outlet or pipe (**)
300
M
from a front surface at a distance of 3 metres from the exhaust gas outlet
2000
N
like the previous one, but with opening
3000
(*)
In so far the balcony width does not exceed 2000 mm.
(**)
If the pipe constructive materials were sensitive to the action from the flue gases, this distance should be longer
than 500 mm.
ATTENTION:
All the fittings used in the combustion products exhaustion and air intake are to be those
supplied by DOMUSA TEKNIK firm.