background image

10

EN

Installation 

Slide Topper

 

I

Unfurling the awning fabric more than one 
revolution of fabric can cause issues with the awing 
function.

9.  With the slide-out room of the RV completely closed, 

carefully lift the Slide Topper to the installed awning 
rail end above the top of the slide-out.

10. While one person guides the awning fabric (or 

awning roller cover, if applicable) into the awning rail, 
carefully slide the Slide Topper until the fabric is in the 
desired position.

 

I

A stepladder may be necessary to guide the fabric.

4.2 Installing the Mounting Brackets

1.  Drill a 3/16 in. (0.12 cm) [7/32 in. (0.56 cm) if you are 

drilling into steel] hole approximately 1 in.  
(2.5 cm) deep into the slide-out room on the marked 
hole locations.

2.  Apply sealant to the provided #10 - 12 x 1 in. screws.

3.  Place the mounting brackets onto the marked 

locations on the RV slide-out room.

4.  Tighten the screws through the mounting bracket and 

into the solid structure of the RV slide-out room.

 

I

If an optional spacer kit is needed, use the #10 x 
1.75 in. screws provided with the kit. Use the 3/16 
x 1 in. oscar rivets when installing the mounting 
brackets onto laminated walls.

q

r

w

y

e

t

10 

Securing the Mounting Bracket

q

 Mounting Bracket

r

 Extension Cap

w

 #10 - 12 x 1 in. Screw

t

 LH Arm

e

 Extension

y

 Slide-Out Room

5.  Repeat steps 1 – 5 for the other mounting bracket.

Do not allow the mounting brackets to extend more 
than half their length beyond the end of the extension 
bar. At least 50% of the mounting bracket length must 
be inserted into the extension.

6.  Center the Slide Topper on the RV slide-out room.

w

r

q

e

11 

Securing the Extension to the Mounting Bracket

q

 Mounting Bracket

e

 LH Arm

w

 #8 – 18 x 3/8 in. Screw

r

 Extension

7.  Insert the provided #8 – 18 x 3/8 in. screws into the 

mounting brackets.

8.  Clamp the Slide Topper extensions onto the 

mounting brackets.

w

e

q

12 

Removing the Cotter Pin

q

 Cotter Pin

e

 LH Arm

w

 End Cap

Summary of Contents for SLIDE TOPPER

Page 1: ...WNINGS SLIDE TOPPER REVISION E Form No 3314719 000 08 19 2019 Dometic Corporation Hardware 98000 LL 40 Y Fabric Roller Tube Assembly 98 X 0 Z YY LLL EN Slide Topper Installation and Operation Manual 2...

Page 2: ...nation of Symbols and Safety Instructions This manual has safety information and instructions to help you eliminate or reduce the risk of accidents and injuries 1 1 Recognize Safety Information This i...

Page 3: ...knowledge to use this product unless they have been given supervision or instruction concerning the use of this product by a person responsible for their safety Never leave an open Slide Topper unatte...

Page 4: ...pack 3106774 262 1 Oscar Rivet 10 pack 113008P10 1 Oscar Rivet 100 pack 113008P100 1 Recommended Tools Drill Flat Screwdriver 3 16 in 4 7 mm Drill Bit 7 16 in 11 mm Drill Bit Sealant File Measuring T...

Page 5: ...Employ as steep of a pitch as possible for the awning fabric without exceeding the maximum distance required between the awning rail and mounting bracket refer to Figure 2 and Figure 3 Exceeding the...

Page 6: ...dentified clearances In addition the Slide Topper must have a 0 5 in 1 3 cm minimum clearance between the Slide Topper rotating assembly all obstructions on the RV slide out room and all obstructions...

Page 7: ...pecial features like a large curve or the flange is recessed into the RV wall use a mounting bracket spacer not included I IThe mounting bracket spacer thickness may vary depending on the spacer kit r...

Page 8: ...ly qTorsion Rod eCotter R Pin wLH Arm rExtension 1 Carefully lay the FRTA onto a clean well padded V trough or other well protected surface to prevent fabric damage 2 Place the LH left hand arm onto t...

Page 9: ...damage The cotter pins must be removed from the Slide Topper end caps before operating the slide out room Failure to remove the cotter pins before operation can result in product damage This section...

Page 10: ...V slide out room 4 Tighten the screws through the mounting bracket and into the solid structure of the RV slide out room I IIf an optional spacer kit is needed use the 10 x 1 75 in screws provided wit...

Page 11: ...w Bracket eEnd Cap 1 Determine onto which end cap the anti billow stop will be installed I ISlide Toppers 198 in 503 cm or wider require an anti billow stop at both end caps and a cradle kit for the c...

Page 12: ...sethe properoscarrivets notprovided instead of thescrews Referto FindingToolsand Materials onpage3 11 Remove the tape from the anti billow stop end cap and anti billow bracket 12 Repeat steps 1 11 for...

Page 13: ...NOTICE Do not close the RV slide out room or the Slide Topper with leaves sticks or other debris on the awning fabric Damage to the fabric or Slide Topper can occur I IIf the RV slide out room is left...

Page 14: ...iceable when retracted and after prolonged periods of stowage Leave the Slide Topper open during warm weather to minimize the wrinkling over a period of time 6 2 1 Cleaning the Fabric Perform the foll...

Page 15: ...about how to dispose of the product in accordance with all applicable national and local regulations LIMITED ONE YEAR WARRANTY LIMITED ONE YEAR WARRANTY AVAILABLE AT WWW DOMETIC COM WARRANTY IF YOU H...

Page 16: ...Mobile living made easy dometic com YOUR LOCAL DEALER dometic com dealer YOUR LOCAL SUPPORT dometic com contact YOUR LOCAL SALES OFFICE dometic com sales offices...

Reviews: