18
※ Watering for initial operation
1.
Open panel and connect the watering hose [1/2”stainless flexible
hose] to solenoid valve
2.
Open the ball valve [Available to throttle watering volume by this
valve]
3.
Power On at control box
4.
Check the watering out of rinse nozzle after opening panel
[It takes 20 minutes to fill up the tank]
5.
Check the start lamp (green color) at control box
If green lamp on, the tank is full and the M/C ready to start
6.
Turn on the start switch at control box.
Summary of Contents for DRC-1G
Page 4: ...4...
Page 6: ...6 3 Parts Name...
Page 13: ...13 7 Electrical parts 1 Contactor Overload Relay...
Page 14: ...14 2 Earth Leakage Circuit Breaker...
Page 15: ...15 3 ELECTRIC WIRE DIAGRAM...
Page 16: ...16...