
TDR9000
™
Circuit Breaker Test System User’s Guide
72A-1898 Rev. A 11/01
A-71
Monday
, November 26, 2001 1:09 pm
Main Contact
Timing – Open
Parameters include:
Minimum
The minimum time for the Main Contacts to part.
Maximum
The maximum time for the Main Contacts to part.
Figure A.83 shows how contact timing occurs on a module-by-module
level.
Module (A)
The maximum allowable difference in time
between the opening of the two Main Contacts in
any module.
Phase (B)
The maximum allowable difference in time
between the opening of any two Main Contacts in
a phase.
Breaker (C)
The maximum allowable difference in time
between the opening of any two Main Contacts in
a circuit breaker.
Figure A.83 Main Contact Timing – Open Breaker
Module #1
Module #1
Module #2
Module #1
Module #2
Module #2
#!
#2
#3
#4
#!
#2
#3
#4
Contact #1
Contact #2
Contact #3
Contact #4
Main Contact
opening time
A
B
C
A
B
C
0
20
40
60
80
100
Time (ms)
First Switch to Last Switch
Summary of Contents for TDR9000
Page 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...