Installation guide
8
dnp Supernova™
Flex Classic
2.
Attach Plate.B to Plate.C using Screw.D. Measure the distance between the two Plate.A pieces (installed on the ceiling in the
previous step) and space the Plate.B pieces the same distance apart then tighten Screw.D.
Note: Plate.C (x2) are not in the parts kit. They are already installed in the gutter of screen case.
Plate.C
Screen case
Plate.C
Screw.D
Screw.G
Plate.B
Ensure that all Screw.Ds are tightened securely
Make sure that you are at least two
people to do the screen installation.
Screen installation on ceiling
1.
Attach Plate.A to the ceiling using appropriate fasteners (Screw.F
can be used). Measure the length of the screen case and install the
plates far enough apart so that the plates will be near the ends of
the screen when it is installed. The plates must be lined up parallel
to each other to ensure proper operation of the screen.
Front
Plate.A
Screen case
Plate.A
Screw.F
Slide
Plate.B
Safety wire
Ceiling
Ceiling
Screw.G
Safety screw
Screw.F
Installation using anchor bolts
A.
Use Plate.A as a template for installation of the anchor
bolts
B.
Install a flat washer, spring washer and a nut on each
anchor bolt. Tighten the nuts.
C.
Install a second nut (double nut) on each anchor bolt
and tighten. This is to prevent loosening of the first
nut and the screen from falling.
Anchor-bolt
(3/8inch or M10)
Base washer
(3/8inch or M10)
Spring washer
(3/8inch or M10)
Nut
(3/8inch or M10)