E d e l s t a h l p r o d u k t e G m b H
®
heat exchangers - hot water systems - district heating stations
German Quality / TÜV approved production
01/2013 DMS/DINOX reserves the right to make changes without notice.
10
03.2
6.) Primary energy:
gas-/oilfired boiler: number of
capacity of
min. flow
how many boilers
boilers
each boiler
temperature
of which capacity
kW
in summer
are in use
________
________
_______ °C
_____/_____ kW
district heating:
max. flow temperature in winter
_______________ °C
min. flow temperature in summer
_______________ °C
hot water quantity per MW
_______________ m³/h
primary return flow
_______________ °C
(at nominal rated power of the hot water system)
electric heating:
___________ kW available
230 V 50 Hz* 400 V 3 ph*
7.) Max. operating pressuere:
primary
_______________ bar
secondary
_______________ bar
8.) Head losses incl. regulation:
primary
_______________ kPa
secondary
_______________ kPa
9.) For equipment transportation to the place of installation:
min. interior width of the door
_______________ mm
Overhead clearance of the room of _______________ mm
10.) Other remarks:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
*paint out not applicable details