DK2 Power OPD811 Assembly Manual Download Page 20

20  |  

OPD811 man. v.210223

FRANÇ

AIS

TABLE DES MATIÈRES

SECTION I: MONTAGE

ÉTAPE 1: INSTALLATION DES ROUES   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

ÉTAPE 2: INSTALLATION DES GOUPILLES DE BENNE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

ÉTAPE 3: ASSEMBLAGE DE L’ESSIEU ET DE L’ÉCROU  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

ÉTAPE 4: INSTALLATION DES POIGNÉES  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

SECTION II: FONCTIONNEMENT

BRANCHER ET CHARGER LA BATTERIE  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

CONTRÔLES OPÉRATIONNELS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

AVANT D’UTILISER VOTRE CHARIOT BENNE  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

DÉPANNAGE: SI VOTRE APPAREIL NE FONCTIONNE PAS OU BENNE NON FONCTIONNELLE  . . . . . . . . . . . . . . . . . . . 30

SECTION III: ENTRETIEN

LISTE DES PIÈCES  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

DIAGRAMME DES PIÈCES  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

GARANTIE  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

Summary of Contents for OPD811

Page 1: ...RAIN TIRES ASSEMBLY GUIDE PARTS AND SERVICE 702 331 5353 WWW DK2POWER COM DK2 USA WEST 4301 S VALLEY VIEW BLVD SUITE 10 11 LAS VEGAS NEVADA 89103 USA DK2 USA EAST 3750 SOUTH AVENUE NORTH UNIT TOLEDO O...

Page 2: ...LIFT ROD 5 STEP 3 ASSEMBLING THE AXLE AND NUT 6 STEP 4 INSTALLING THE HANDLES 7 SECTION II OPERATION PLUGGING IN AND CHARGING THE BATTERY 10 OPERATIONAL CONTROLS 11 BEFORE USING YOUR DUMP CART 12 TROU...

Page 3: ...SECTION I ASSEMBLY...

Page 4: ...STEP 1 INSTALLING BOTH WHEELS NOTE UPON INSPECTION OF PARTS IF YOU FIND ANY DAMAGED OR MISSING PARTS PLEASE CALL DK2 POWER AT 702 331 5353 OR CONTACT US VIA OUR WEBSITE WWW DK2POWER COM WE WILL REPLAC...

Page 5: ...OPD811 man v 210223 5 ENGLISH ASSEMBLY STEP BY STEP INSTRUCTIONS 1 Tip bucket forward 2 Pin the lift rod STEP 2 PINNING THE LIFT ROD PIN THE LIFT ROD...

Page 6: ...6 OPD811 man v 210223 ENGLISH ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 3 ASSEMBLING THE AXLE AND NUT ASSEMBLE AXLE NUT...

Page 7: ...1 man v 210223 7 ENGLISH ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 4 INSTALLING THE HANDLES 1 Remove the battery compartment cover 2 Install the right and left handle assembly with 4 bolts 4 BOLTS EACH...

Page 8: ......

Page 9: ...SECTION II OPERATION...

Page 10: ...g wire 2 Replace the battery compartment cover 3 Plug into the side port on the curb overnight with the charger provided The charger will light green when done 4 Your handle will read 58 when fully ch...

Page 11: ...RD AND REVERSE CONTROLS throttle speed can be regulated slow to fast Use caution when using reverse at full speed 3 BUCKET LIFT release brake lever and operate dump switch 4 BRAKE release and magic br...

Page 12: ...BATTERY CONNECTIONS 2 MAKE SURE YOUR BATTERIES ARE FULLY CHARGED 3 TURN THE MASTER SWITCH ON THE PANEL TO ON 4 USE THE SWITCH CONTROL TO DUMP THE BUCKET 5 USE THE THUMB THROTTLE CONTROL TO MOVE FORWAR...

Page 13: ...SECTION III MAINTENANCE...

Page 14: ...t main frame cover plate 1 73 Left main frame cover plate 1 74 Electrical box under the baffle 1 MAINTENANCE PARTS LIST NO DESCRIPTION QTY 1 Bucket 1 2 Handle cover 1 3 Switch 1 4 Right handrail 1 8 E...

Page 15: ...OPD811 man v 210223 15 ENGLISH MAINTENANCE PARTS DIAGRAM...

Page 16: ......

Page 17: ...d storage c Expendable parts such as nuts and bolts pins and springs wiring and switch components hydraulic hoses and fittings cutting teeth cutting chains cutting blades throttles belts and tires d N...

Page 18: ...This page is left blank intentionally...

Page 19: ...PNEUS TOUT TERRAIN GUIDE DE MONTAGE PI CES ET SERVICE 702 331 5353 WWW DK2POWER COM DK2 USA OUEST 4301 S VALLEY VIEW BLVD SUITE 10 11 LAS VEGAS NEVADA 89103 TATS UNIS DK2 USA EST 3750 AVENUE SUD UNIT...

Page 20: ...SSEMBLAGE DE L ESSIEU ET DE L CROU 24 TAPE 4 INSTALLATION DES POIGN ES 25 SECTION II FONCTIONNEMENT BRANCHER ET CHARGER LA BATTERIE 28 CONTR LES OP RATIONNELS 29 AVANT D UTILISER VOTRE CHARIOT BENNE 3...

Page 21: ...SECTION I ASSEMBLAGE...

Page 22: ...ROUES REMARQUE LORS DE L INSPECTION DES PI CES SI VOUS TROUVEZ DES PI CES ENDOMMAG ES OU MANQUANTES VEUILLEZ APPELER DK2 POWER AU 702 331 5353 OU CONTACTEZ NOUS VIA NOTRE SITE WEB WWW DK2POWER COM NOU...

Page 23: ...v 210223 23 FRAN AIS ASSEMBLAGE INSTRUCTIONS TAPE PAR TAPE 1 Inclinez la benne vers l avant 2 Installez la tige de levage TAPE 2 INSTALLATION DES GOUPILLES ET TIGE DE BENNE INSTALLATION DES GOUPILLES...

Page 24: ...24 OPD811 man v 210223 FRAN AIS ASSEMBLAGE INSTRUCTIONS TAPE PAR TAPE TAPE 3 ASSEMBLAGE DE L ESSIEU ET DE L CROU ASSEMBLER L ESSIEU ET L CROU...

Page 25: ...5 FRAN AIS ASSEMBLAGE INSTRUCTIONS TAPE PAR TAPE TAPE 4 INSTALLATION DES POIGN ES 1 Retirez le couvercle du compartiment batterie 2 Installez l ensemble de poign es droite et gauche avec 4 boulons 4 B...

Page 26: ......

Page 27: ...SECTION II OP RATION...

Page 28: ...mpartiment batterie en place 3 Branchez le dans le port lat ral c t trottoir pendant la nuit avec le chargeur fourni Le chargeur s allume vert une fois la charge termin e 4 Votre poign e indiquera 58...

Page 29: ...teur peut tre r gl e de lentement rapide Soyez attentif et prudent lorsque vous utilisez la marche arri re pleine vitesse 3 LEVER LA BENNE Rel chez le levier de frein et actionnez le commutateur de d...

Page 30: ...EXIONS DE LA BATTERIE 2 ASSUREZ VOUS QUE VOS BATTERIES SONT COMPL TEMENT CHARG ES 3 METTEZ L INTERRUPTEUR PRINCIPAL DU PANNEAU SUR ON 4 UTILISEZ LA COMMANDE DE L INTERRUPTEUR POUR VIDER LA BENNE 5 UTI...

Page 31: ...SECTION III ENTRETIEN...

Page 32: ...e de recouvrement du ch s sis principal gauche 1 74 Coffret lectrique sous le d flecteur 1 ENTRETIEN LISTE DES PI CES NO DESCRIPTION QT 1 Benne 1 2 Couvercle de poign e 1 3 Interrupteur 1 4 Poign e dr...

Page 33: ...OPD811 man v 210223 33 FRAN AIS ENTRETIEN DIAGRAMME DES PI CES...

Page 34: ......

Page 35: ...ommables telles que les crous et boulons les goupilles et les ressorts les composants de c blage et d interrupteur les flexibles hydrauliques et accessoires dents de coupe cha nes de coupe lames de co...

Reviews: