background image

ZEBRA

INSTALLATION INSTRUCTIONS

3

Step 3: SECURE thE HEAD RAIL

Step 4: INSTALL THE TENSION DEVICE

A.  Lower the shade.

B.  Hold the Tension Device upright so the Warning Tag hangs straight 

down as shown in diagram.

C.  Position the Tension Device on the window frame or the wall so that 

the Tension Device and control cord do not interfere with raising or 

lowering the shade. The Tension Device should be installed without 

stretching or pulling down on the control cord. Stretching the cord will 

cause excessive wear. Do not twist or cross the control cord. If using 

stop balls, position the Tension Device 1/4 inch higher to allow the stop 

ball to pass through the Tension Device.

D.  Holding the Tension Device upright, and in position, as shown, insert 

and secure the screw through the hole. The mounting screw must be 

secured into a solid surface or molly.

To adjust head rail extension, remove the shade from the 

mounting brackets by pressing on the plastic tabs at the 

front of each bracket. Then loosen the nut and bolt, and 

move the mounting brackets forward or backward as 

preferred.

Slide the inner rear of the head rail onto 

the metal tabs at the back of each bracket, 

and then push up so that the brackets 

snap onto the head rail.

IMPORTANT FINAL STEP TO PROPERLY SECURE BRACKETS: Pull the plastic tab on the front of each 

bracket outward toward the front of the shade to lock the brackets in place. For inside-mounts use pliers to 

grasp the tabs. Check carefully to assure that each bracket is properly secured

Reviews: