Dixie 25D-TWIN-AL Operator'S Manual Download Page 2

1

INTRODUCTION

The DIXIE M odel 25D-700-TW IN-AL is adaptable for
closing containers from 1½" to 4¼" diameters, up to 7" tall.
Change parts are required for closing each size container.
The M odel 25D-TW IN-AL is designed with an air lift
assembly to raise containers into position with the seaming
rolls and chuck.  The Model 25D-TW IN-AL may be
equipped with a single or dual switches to activate the air lift
and subsequently the seaming cycle.  Alternatively, it may be
equipped with a sensor switch and programmed at the factory
for a built-in delay, suitable for your container, to allow
adequate time to place containers in the seamer before the
sensor switch activates the air lift to raises the containers into
position for the automatic seaming cycle.  An average
capacity is 30 cans per minute depending on container size
and operator dexterity.

OPERATION

W ITH SINGLE SW ITCH:

  Operator positions cans with

tops then presses the start switch.  The cans are automatically
raised, double seamed, and lowered.  Operator removes cans
and repeats the operation.

W ITH DUAL  SW ITCHES:

  Operator positions cans with

tops then simultaneously presses  both start switches.  The
cans are automatically raised, double seamed, and lowered.
Operator removes cans and repeats the operation.

W ITH SENSOR SW ITCH:

  Operator positions cans with

tops.  After a brief programmed delay, the cans are automati-
cally raised, double seamed, and lowered.  Operator removes
cans and repeats the operation.

*** INSTALLATION ***

BEFORE OPERATING YOUR DIXIE DOUBLE SEAM ER
REVIEW  THIS MANUAL. Also make certain that:

1. The seamer is secured directly to the floor or other stable

base with concrete drill-in anchor bolts or lag screws
using the appropriate anchoring system suitable for your
specific flooring and/or sub-flooring. Four (4) mounting
brackets with 9/16" diameter holes are located at each
corner of the cabinet base

.

2.  The machine is properly connected to 115 VAC, 60 Hz

electrical and 85 to 100 psi maximum air supply.

3. Auxiliary and accessory items are properly attached.
4. All moving parts are periodically oiled to prevent

unnecessary wear. 

5.

The machine is properly adjusted for the cans to be
closed.  Inspect machine adjustments periodically to
assure proper results.

6.

If used occasionally or inactive for more than a few
days, give special attention to servicing before and after
storage.

Summary of Contents for 25D-TWIN-AL

Page 1: ...OPERATOR S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D TWIN AL ...

Page 2: ...rator positions cans with tops then simultaneously presses both start switches The cans are automatically raised double seamed and lowered Operator removes cans and repeats the operation WITH SENSOR SWITCH Operator positions cans with tops After a brief programmed delay the cans are automati cally raised double seamed and lowered Operator removes cans and repeats the operation INSTALLATION BEFORE ...

Page 3: ...reassemble making certain that the retainer spring and metal discs are properlyseatedandthattheentireassemblyis adequately lubricated oiled 2 Insert screwdriver into hole in tope of base plate and remove the set screw 56 by turning counterclockwise 3 Insert screwdriver into same hole and turn adjusting screw 57 in the proper direction to lengthen or shorten effective height of the base plate as ma...

Page 4: ...1 year or when a pressure drop of 15 psi is reached Periodically observe condensate level through sight glass in filter and manually drain as needed NOTE Sufficient air pressure must be provided to cause the plunger of the air lift assembly 803 to extend to its locked position Do not exceed 100 psi NEUTRAL POSITION The machine is in a neutral position when both cam rolls 20 are in their innermost ...

Page 5: ...peration seam Final adjustments may be made after a can is closed and the double seam in spected SECOND OPERATION 1 Turn power to machine ON which will automatically complete the fifth revolution Press and release the actuator FOUR times and turn power to machine OFF This is a total of nine 9 revolutions from the beginning and puts the second operation seam roll into its inner most position with t...

Page 6: ...the chuck onto the chuck shaft Use the chuck wrench as described above to tighten snugly Make certain that the new chucks are properly tightened into position against the shoulders of the chuck shafts 4 Install the proper base plates and height spacers if required for the cans to be closed Adjust the base pressures see page 2 and seaming rolls see page 4 as described in this manual CLUTCH BRAKE SO...

Page 7: ...n or wrong size chuck 4 Seaming rolls binding on pins B Machine operates with undue noise or locks 1 Machine not properly timed C Unusually loose seaming rolls 1 Seaming roll or pins worn D Seaming rolls do not return to neutral position 1 Seaming roll levers binding 2 Seaming lever spring weak or broken 3 Machine not properly timed E Machine seems to labor or freeze tight 1 Needs oil 2 Too much b...

Page 8: ...7 ...

Page 9: ...8 ...

Page 10: ...9 ...

Page 11: ...S Gears inside gear housing through drive collar Seam Rolls and Cam Rolls Seam Roll Levers through gear housing arms where indicated Base Plate stem Air Lift Shaft must be lubricated to prevent binding through Plunger Housing ...

Reviews: