NAME
DATE
DESCRIPTION
REVISION LEVEL
NAME
DATE
DESCRIPTION
EMK
8/21/15
CREATED ASSEMBLY INSTRUCTIONS
REV.
A
ECN NO.
-
IN HOUSE ASSEMBLY TEMPLATE
UNLESS OTHERWISE SPECIFIED
DIMENSION ARE IN INCHES
DWN
TITLE:
BY:
BY:
APR
DATE:
DWN
APR:
DATE
REVISION:
SCALE:
SHEET:
DRAWING NUMBER:
300 South Krueger Street
Suring, WI 54174
diversifiedwoodcrafts.com
THIS DRAWING IS THE SOLE PROPERTY OF
DIVERSIFIED WOOD CRAFTS. IT MAY NOT
BE ALTERED OR CHANGED WITHOUT
PERMISSION
BY:
APR
APR:
DATE
3116K
SERVCE ISLAND
ASSEMBLY INSTRUCTIONS
REV A
3 OF 4
NTS
EMK
8/21/15
NOTE:
1.
ALL WATER, ELECTRICAL, AND GAS CONNECTIONS SHOULD BE
PERFORMED BY A TRAINED PROFESSIONAL PER LOCAL CODE.
STEP 1:
CENTER THE CABINET OVER THE UTILITY HOOK-UPS.
FASTEN CABINET TO WALL. NOTE: CABINET MUST BE
LEVELED OR DOORS AND DRAWERS MAY NOT OPEN
OR CLOSE CORRECTLY .
STEP 2:
APPLY SILICONE ADHESIVE TO TOP EDGES OF
CABINET. PLACE TOP ON CABINET WITH PROPER
OVERHANG (1" OVERHANG ON FRONT, BACK,
AND SIDES). TOP IS CENTERED AT THAT DIMENSION.
LET CURE FOR 6-12 HOURS.
STEP 3:
APPLY ADHESIVE TO THE SINK OPENING ON
TOP. LOWER SINK INTO OPENING. WIPE OFF
ANY EXCESS CAULK AND ALLOW TO SET. LET
CURE FOR 6-12 HOURS.
STEP 4:
INSTALL THE MULTI-SERVICE FIXTURES IN THE TOP. ATTACH
RUBBER BASE MOLDING TO BASE OF CABINET USING
CONTACT CEMENT. AFTER MOLDING IS IN PLACE, SCREW
STAINLESS STEEL CORNER BRACKETS ON EACH CORNER
OVER THE BASE MOLDING WITH SCREWS PROVIDED.
COMPLETE UNIT SHOWN
MULTI-SERVICE
FIXTURE
TOP VIEW OF SERVICE ISLAND SHOWN
TOP VIEW OF SERVICE ISLAND SHOWN
APPLY SILICONE ADHESIVE TO TOP EDGES OF
CABINET AND TO SINK OPENING ON TOP
TOP
ATTACH RUBBER
MOLDING HERE
K:\DIVERSIFIED\ASSEMBLY INSTRUCTIONS\ACAD\3116K.dwg, 12/2/2016 11:54:38 AM, DWG To PDF.pc3