5
4. Earth wire: the earth wire of the steam room shall be connected reliably to the grounding
unit of the building, as well as the earth wire of the power socket.
V. Drain connection
1. Move the steam room assembled completely and connected with water and electricity
supplies back to the installation position selected.
2. Lead the drain pipe on the bottom of the tub into the floor drainer preset in the bathroom.
Take care not to squeeze, bend or clog the flexible drain pipe, to make sure of the fast and
smooth drainage.
3. In case of any leakage of the drainer, stop it up with the rubber pad or silicone.
VI. Installation steps:
A.
Two persons are required to assemble the unit.
B.
The glass is toughened safety glass. Please take great care when handling and fitting
the glass panels. In particular, avoid the glass edges coming into contact with hard
surfaces.
Level the tray to the ground(adjust the feet if needed), make sure the drain hose is
installed already and put it into the water outlet of the ground. Put a blanket or carton on
the tray to prevent from scratches
1
Summary of Contents for WG-U692T
Page 14: ...14 ...