750 Tracker - CONTROLS
11
SETUP
750 Tracker - CONTROLS
11
SETUP
SETUP
Install batteries
Use 6 C-cell alkaline batteries in
tracker. To install:
•
unscrew battery cover
•
insert batteries as indicated
•
close cover and tighten screw
•
check operation
Check Operation
Always check that tracker operates before leaving for jobsite and
after every battery change. To check operation:
•
turn on tracker
•
entire display will light briefly
•
battery level will be shown graphically
•
unit defaults to 29 kHz mode
Summary of Contents for Subsite 750
Page 6: ...6 750 Tracker CONTENTS SERVICE PROCEDURE 6 750 Tracker CONTENTS SERVICE PROCEDURE...
Page 20: ...20 750 Tracker SAFETY ALERTS 20 750 Tracker SAFETY ALERTS...
Page 34: ...34 750 Tracker OPERATION 34 750 Tracker OPERATION...
Page 36: ...36 750 Tracker MAINTENANCE 36 750 Tracker MAINTENANCE...